|
![Filename=211-19.jpg
Filesize=214KiB
Dimensions=1280x847
Date added=Oct 26, 2014 211-19.jpg](albums/Inter_Scans/211/thumb_211-19.jpg)
211-19126 viewsEast Weipa Mine Centre, Komatsu HD1400 with a Tubemakers belly dump trailer.
|
|
![Filename=211-20.jpg
Filesize=191KiB
Dimensions=1280x846
Date added=Oct 26, 2014 211-20.jpg](albums/Inter_Scans/211/thumb_211-20.jpg)
211-20117 viewsEast Weipa Mine Centre, a Komatsu HD1400 with a Tubemakers belly dump trailer.
|
|
![Filename=211-21.jpg
Filesize=248KiB
Dimensions=1280x847
Date added=Oct 26, 2014 211-21.jpg](albums/Inter_Scans/211/thumb_211-21.jpg)
211-21140 viewsEast Weipa Mining Centre, Tiger Engineering Pty Ltd 690B wheel dozer.
|
|
![Filename=211-22.jpg
Filesize=205KiB
Dimensions=1280x848
Date added=Oct 26, 2014 211-22.jpg](albums/Inter_Scans/211/thumb_211-22.jpg)
211-22108 viewsEast Weipa Mine Centre, a Tubemakers belly dump trailer on a Komatsu HD1400 prime mover.
|
|
![Filename=211-23.jpg
Filesize=206KiB
Dimensions=1280x845
Date added=Oct 26, 2014 211-23.jpg](albums/Inter_Scans/211/thumb_211-23.jpg)
211-23127 viewsEast Weipa Mine Centre, the 'Go Line' from the rear with the Komatsu HD1400 truck and trailers all lined up.
|
|
![Filename=211-24.jpg
Filesize=214KiB
Dimensions=1280x848
Date added=Oct 26, 2014 211-24.jpg](albums/Inter_Scans/211/thumb_211-24.jpg)
211-24129 viewsWeipa, Lorim Point railway workshops, front view of Comalco R 1001 loco Clyde Engineering EMD model GT26C serial 72-752 while is sits at the fuel point, items of note are the second 'tropical roof' and the five chime horn cut into the nose. Also as the Weipa locomotives don't work in MU there is only the train brake hose and the main res hose for charging the belly dump discharge doors.
|
|
![Filename=211-25.jpg
Filesize=246KiB
Dimensions=1280x846
Date added=Oct 26, 2014 211-25.jpg](albums/Inter_Scans/211/thumb_211-25.jpg)
211-25112 viewsWeipa, Lorim Point railway workshops, 3/4 LHS or driver's side view of Comalco R 1001 loco Clyde Engineering EMD model GT26C serial 72-752 while is sits at the fuel point, items of note are the second 'tropical roof' and the five chime horn cut into the nose. Also noticeable, the units don't have dynamic brakes fitted so there is no brake 'blister' in the middle of the hood like the WAGR L or VR C classes which are also GT26C models.
|
|
![Filename=211-26.jpg
Filesize=214KiB
Dimensions=1280x842
Date added=Oct 26, 2014 211-26.jpg](albums/Inter_Scans/211/thumb_211-26.jpg)
211-26123 viewsWeipa, Lorim Point railway workshops, 3/4 RHS or observer's side view of Comalco R 1001 loco Clyde Engineering EMD model GT26C serial 72-752 while is sits at the fuel point, items of note are these units were setup to have the long hood leading, the CCTV camera looking down the long hood, the second 'tropical roof' and the five chime horn cut into the nose. Also noticeable, the units don't have dynamic brakes fitted so there is no brake 'blister' in the middle of the hood like you see on the WAGR L or VR C classes which are also GT26C models.
|
|
![Filename=211-27.jpg
Filesize=186KiB
Dimensions=1280x833
Date added=Oct 26, 2014 211-27.jpg](albums/Inter_Scans/211/thumb_211-27.jpg)
211-27116 viewsWeipa, Lorim Point railway workshops, 3/4 RHS or observer's side view of Comalco R 1001 loco Clyde Engineering EMD model GT26C serial 72-752 while is sits at the fuel point, items of note are these units were setup to have the long hood leading, the CCTV camera looking down the long hood, the second 'tropical roof' and the five chime horn cut into the nose. Also noticeable, the units don't have dynamic brakes fitted so there is no brake 'blister' in the middle of the hood like you see on the WAGR L or VR C classes which are also GT26C models.
|
|
![Filename=211-28.jpg
Filesize=243KiB
Dimensions=1280x837
Date added=Oct 26, 2014 211-28.jpg](albums/Inter_Scans/211/thumb_211-28.jpg)
211-28104 viewsWeipa, Lorim Point railway workshops, view of the end of the line looking east, workshops in the distance.
|
|
![Filename=211-29.jpg
Filesize=214KiB
Dimensions=1280x842
Date added=Oct 26, 2014 211-29.jpg](albums/Inter_Scans/211/thumb_211-29.jpg)
211-29108 viewsWeipa, Lorim Point, side view of no. 1 bauxite ship loader in the cyclone tie-down position.
|
|
![Filename=211-30.jpg
Filesize=250KiB
Dimensions=1280x845
Date added=Oct 26, 2014 211-30.jpg](albums/Inter_Scans/211/thumb_211-30.jpg)
211-30121 viewsWeipa, Lorim Point overview looking south east from the kaolin loader at no. 2 berth showing berth construction, tug boats, no. 2 bauxite loader and the TNT Capricornia, a coal fired 75,500-dwt bulk carrier built by Italcantieri for TNT Bulkships trade run between Gladstone and Weipa.
|
|
![Filename=211-31.jpg
Filesize=217KiB
Dimensions=840x1280
Date added=Oct 26, 2014 211-31.jpg](albums/Inter_Scans/211/thumb_211-31.jpg)
211-31116 viewsWeipa, Lorim Point bauxite berth, TNT Capricornia, a coal fired 75,500-dwt bulk carrier built by Italcantieri for TNT Bulkships trade run between Gladstone and Weipa.
|
|
![Filename=211-32.jpg
Filesize=241KiB
Dimensions=1280x846
Date added=Oct 26, 2014 211-32.jpg](albums/Inter_Scans/211/thumb_211-32.jpg)
211-32107 viewsWeipa, Lorim Point overview of no. 2 bauxite berth looking south east, line boat, tug boats, no. 2 ship loader and the TNT Capricornia, a coal fired 75,500-dwt bulk carrier built by Italcantieri for TNT Bulkships trade run between Gladstone and Weipa.
|
|
![Filename=211-33.jpg
Filesize=233KiB
Dimensions=843x1280
Date added=Oct 26, 2014 211-33.jpg](albums/Inter_Scans/211/thumb_211-33.jpg)
211-33105 viewsWeipa, Lorim Point view looking north from kaolin loader across no. 1 ship loader with Humbug Point Wharf (or town wharf) in the distance.
|
|
![Filename=211-34.jpg
Filesize=213KiB
Dimensions=1280x855
Date added=Oct 26, 2014 211-34.jpg](albums/Inter_Scans/211/thumb_211-34.jpg)
211-34101 viewsWeipa, Lorim Point view looking north east from the kaolin loader back towards the bauxite stockpiles, calcination shed and kaolin storage silos. The elevated conveyor is for kaolin, while the two conveyors running under the road to the right are the bauxite loading conveyors.
|
|
![Filename=211-35.jpg
Filesize=223KiB
Dimensions=1280x845
Date added=Oct 26, 2014 211-35.jpg](albums/Inter_Scans/211/thumb_211-35.jpg)
211-35106 viewsWeipa, Lorim Point overview of no. 2 bauxite berth looking south east, tug boats, no. 2 ship loader and the TNT Capricornia, a coal fired 75,500-dwt bulk carrier built by Italcantieri for TNT Bulkships trade run between Gladstone and Weipa.
|
|
![Filename=211-36.jpg
Filesize=242KiB
Dimensions=1280x849
Date added=Oct 26, 2014 211-36.jpg](albums/Inter_Scans/211/thumb_211-36.jpg)
211-36129 viewsWeipa, Lorim Point view of the Comalco Kaolin ship loading facility, pivot point and loading conveyor with the red frame on the wharf forming the loader structure.
|
|
|
|
|