|
![Filename=226-21.jpg
Filesize=293KiB
Dimensions=1280x853
Date added=Nov 13, 2015 226-21.jpg](albums/Pilbara/226/thumb_226-21.jpg)
226-2169 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track. GeoData.
|
|
![Filename=226-22.jpg
Filesize=279KiB
Dimensions=1280x851
Date added=Nov 13, 2015 226-22.jpg](albums/Pilbara/226/thumb_226-22.jpg)
226-2271 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track, side view. GeoData.
|
|
![Filename=226-23.jpg
Filesize=254KiB
Dimensions=1280x851
Date added=Nov 13, 2015 226-23.jpg](albums/Pilbara/226/thumb_226-23.jpg)
226-2370 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.
|
|
![Filename=226-24.jpg
Filesize=278KiB
Dimensions=1280x848
Date added=Nov 13, 2015 226-24.jpg](albums/Pilbara/226/thumb_226-24.jpg)
226-2472 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.
|
|
![Filename=226-25.jpg
Filesize=308KiB
Dimensions=1280x851
Date added=Nov 13, 2015 226-25.jpg](albums/Pilbara/226/thumb_226-25.jpg)
226-2570 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|
![Filename=226-26.jpg
Filesize=305KiB
Dimensions=1280x847
Date added=Nov 13, 2015 226-26.jpg](albums/Pilbara/226/thumb_226-26.jpg)
226-2673 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|
![Filename=226-27.jpg
Filesize=295KiB
Dimensions=1280x841
Date added=Nov 13, 2015 226-27.jpg](albums/Pilbara/226/thumb_226-27.jpg)
226-2763 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|
![Filename=226-28.jpg
Filesize=288KiB
Dimensions=1280x841
Date added=Nov 13, 2015 226-28.jpg](albums/Pilbara/226/thumb_226-28.jpg)
226-2866 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|
![Filename=226-29.jpg
Filesize=307KiB
Dimensions=1280x840
Date added=Nov 13, 2015 226-29.jpg](albums/Pilbara/226/thumb_226-29.jpg)
226-2981 viewsShaw siding, the loaded train is winning the climb as second unit 5636 'Munda' serial 8151-11 / 91-122 another Goninan CM40-8M GE rebuild assists in powering the train to port. GeoData.
|
|
![Filename=226-30.jpg
Filesize=264KiB
Dimensions=1280x847
Date added=Nov 13, 2015 226-30.jpg](albums/Pilbara/226/thumb_226-30.jpg)
226-3064 viewsShaw siding, the loaded train heading north behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons and a couple of the smooth sided experimental Comeng waggons. GeoData.
|
|
![Filename=226-31.jpg
Filesize=257KiB
Dimensions=1280x846
Date added=Nov 13, 2015 226-31.jpg](albums/Pilbara/226/thumb_226-31.jpg)
226-3173 viewsShaw siding, the loaded train heading north around the 698 metre radius curve behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons. GeoData.
|
|
![Filename=226-32.jpg
Filesize=272KiB
Dimensions=1280x845
Date added=Nov 13, 2015 226-32.jpg](albums/Pilbara/226/thumb_226-32.jpg)
226-3265 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.
|
|
![Filename=226-33.jpg
Filesize=273KiB
Dimensions=1280x846
Date added=Nov 13, 2015 226-33.jpg](albums/Pilbara/226/thumb_226-33.jpg)
226-3371 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.
|
|
![Filename=226-34.jpg
Filesize=248KiB
Dimensions=1280x854
Date added=Nov 13, 2015 226-34.jpg](albums/Pilbara/226/thumb_226-34.jpg)
226-3469 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the vinyl windscreen protectors are fitted to the windscreens, note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.
|
|
![Filename=226-35.jpg
Filesize=286KiB
Dimensions=1280x853
Date added=Nov 13, 2015 226-35.jpg](albums/Pilbara/226/thumb_226-35.jpg)
226-3570 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the CCTV camera is visible under the radiator wing, this was a trial for single man crewing when operating long end lead, also note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.
|
|
![Filename=226-36.jpg
Filesize=304KiB
Dimensions=1280x850
Date added=Nov 13, 2015 226-36.jpg](albums/Pilbara/226/thumb_226-36.jpg)
226-3670 viewsShaw siding 219 km, 5654 'Kashima' serial 8412-11 / 93-145 is the trail or slave remote on the mid-train pair of units, note the large flat fuel tank indicating this unit was a Comeng NSW built ALCo before rebuild. GeoData.
|
|
![Filename=226-37.jpg
Filesize=178KiB
Dimensions=1280x851
Date added=Nov 13, 2015 226-37.jpg](albums/Pilbara/226/thumb_226-37.jpg)
226-3790 viewsShaw siding back track, 219 km, a defected waggon has been cut off a loaded Yandi train, waggon 1567 is a Comeng WA build from a batch of 288 built in 1974. GeoData.
|
|
|
|
|
|