Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0227

227-21.jpg
227-21410 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
227-22.jpg
227-22390 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind Goninan CM40-8M GE rebuilds 5649 'Pohang' serial 8412-07/93-140 and 5651 with third unit an General Electric AC6000. GeoData.
227-23.jpg
227-23399 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind Goninan CM40-8M GE rebuilds 5649 'Pohang' serial 8412-07/93-140 and 5651 with third unit an General Electric AC6000. GeoData.
227-24.jpg
227-24524 views30 km area, second unit on an empty ore train 5651 'Tobata' serial 8412-08 / 93-142 a Goninan CM40-8M GE rebuild. GeoData.
227-25.jpg
227-25429 views30 km area, third unit on an empty ore train is class leader 6070 'Port Hedland' serial 51062 a General Electric AC6000 built by GE Erie. GeoData.
227-26.jpg
227-26416 views30 km looking south, empty ore train with mostly Comeng built ore waggons. GeoData.
227-27.jpg
227-27428 views30 km area, mid-train remote units 5659 and 5641 both Goninan CM40-8M GE rebuilds. GeoData.
227-28.jpg
227-28487 views30 km area, mid-train lead remote 5659 'Kobe' serial 8412-04/94-150 a Goninan CM40-8M GE rebuild. GeoData.
227-29.jpg
227-29423 views30 km area, mid-train lead remote 5641 'Indee' serial 8281-06/92-130 a Goninan CM40-8M GE rebuild. GeoData.
227-30.jpg
227-30419 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
227-31.jpg
227-31470 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
227-32.jpg
227-32432 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
227-33.jpg
227-33423 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
227-34.jpg
227-34430 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. Toyota tray back. GeoData.
227-35.jpg
227-35392 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. Toyota tray back. GeoData.
227-36.jpg
227-36441 viewsNelson Point, tug boat Warilla, 50 ton bollard pull Z-Peller type, built by Tamar Steel Boats in Launceston in 1982, pulls a loaded carrier clear of B berth.
227-37.jpg
227-37437 viewsNelson Point, tug boat Warilla, 50 ton bollard pull Z-Peller type, built by Tamar Steel Boats in Launceston in 1982, pulls a loaded carrier clear of B berth as a sister vessel Warang passes behind.
     
37 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional