|
![Filename=230-00.jpg
Filesize=298KiB
Dimensions=1280x850
Date added=Nov 13, 2015 230-00.jpg](albums/Pilbara/230/thumb_230-00.jpg)
230-0090 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-01.jpg
Filesize=306KiB
Dimensions=1280x853
Date added=Nov 13, 2015 230-01.jpg](albums/Pilbara/230/thumb_230-01.jpg)
230-0177 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-02.jpg
Filesize=282KiB
Dimensions=1280x848
Date added=Nov 13, 2015 230-02.jpg](albums/Pilbara/230/thumb_230-02.jpg)
230-0275 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-03.jpg
Filesize=289KiB
Dimensions=1280x849
Date added=Nov 13, 2015 230-03.jpg](albums/Pilbara/230/thumb_230-03.jpg)
230-0381 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-04.jpg
Filesize=297KiB
Dimensions=1280x848
Date added=Nov 13, 2015 230-04.jpg](albums/Pilbara/230/thumb_230-04.jpg)
230-0484 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-05.jpg
Filesize=303KiB
Dimensions=1280x850
Date added=Nov 13, 2015 230-05.jpg](albums/Pilbara/230/thumb_230-05.jpg)
230-0579 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-06.jpg
Filesize=280KiB
Dimensions=1280x847
Date added=Nov 13, 2015 230-06.jpg](albums/Pilbara/230/thumb_230-06.jpg)
230-0681 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-07.jpg
Filesize=276KiB
Dimensions=1280x840
Date added=Nov 13, 2015 230-07.jpg](albums/Pilbara/230/thumb_230-07.jpg)
230-0790 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train with dual CM40-8M units on the point, heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-08.jpg
Filesize=241KiB
Dimensions=1280x842
Date added=Nov 13, 2015 230-08.jpg](albums/Pilbara/230/thumb_230-08.jpg)
230-0882 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train behind CM40-8M units 5654 and 5637 crossing the YT 311.5 km grade crossing. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-09.jpg
Filesize=249KiB
Dimensions=1280x844
Date added=Nov 13, 2015 230-09.jpg](albums/Pilbara/230/thumb_230-09.jpg)
230-0992 viewsYandi Two balloon loop, empty car side, side view of two Goninan GE CM40-8M rebuilds from different ALCo builders. 5654 'Kashima' serial 8412-11/93-145 is from Comeng ALCo M636 unit 5493 while 5637 'De Grey' serial 8181-01/92-123 is from an AE Goodwin ALCo C636 unit 5456. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-10.jpg
Filesize=275KiB
Dimensions=1280x846
Date added=Nov 13, 2015 230-10.jpg](albums/Pilbara/230/thumb_230-10.jpg)
230-10107 viewsYandi Two balloon loop, empty car line, mid-train remote units side view, two Goninan GE CM40-8M rebuilds from different ALCo builders. 5657 'Fukuyama' serial 8412-02/94-148 is from Comeng ALCo M636 unit 5492 while 5639 'Corunna Downs' serial 8281-03/92-128 is from an AE Goodwin ALCo C636 unit 5459. Geodata -22.713725, 119.055762 .
|
|
![Filename=230-11.jpg
Filesize=261KiB
Dimensions=843x1280
Date added=Nov 13, 2015 230-11.jpg](albums/Pilbara/230/thumb_230-11.jpg)
230-1181 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-12.jpg
Filesize=272KiB
Dimensions=845x1280
Date added=Nov 13, 2015 230-12.jpg](albums/Pilbara/230/thumb_230-12.jpg)
230-1277 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. The pipe is for the dust extraction system. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-13.jpg
Filesize=284KiB
Dimensions=847x1280
Date added=Nov 13, 2015 230-13.jpg](albums/Pilbara/230/thumb_230-13.jpg)
230-1373 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-14.jpg
Filesize=254KiB
Dimensions=851x1280
Date added=Nov 13, 2015 230-14.jpg](albums/Pilbara/230/thumb_230-14.jpg)
230-1481 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-15.jpg
Filesize=226KiB
Dimensions=854x1280
Date added=Nov 13, 2015 230-15.jpg](albums/Pilbara/230/thumb_230-15.jpg)
230-1582 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-16.jpg
Filesize=219KiB
Dimensions=850x1280
Date added=Nov 13, 2015 230-16.jpg](albums/Pilbara/230/thumb_230-16.jpg)
230-1674 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-17.jpg
Filesize=241KiB
Dimensions=1280x847
Date added=Nov 13, 2015 230-17.jpg](albums/Pilbara/230/thumb_230-17.jpg)
230-1776 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-18.jpg
Filesize=226KiB
Dimensions=1280x848
Date added=Nov 13, 2015 230-18.jpg](albums/Pilbara/230/thumb_230-18.jpg)
230-1881 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-19.jpg
Filesize=261KiB
Dimensions=1280x850
Date added=Nov 13, 2015 230-19.jpg](albums/Pilbara/230/thumb_230-19.jpg)
230-1992 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The pipe and fan are for the dust extraction system. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|
|