Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0239

239-20.jpg
239-2098 viewsYandi One primary crusher, GS01, a Jaques grizzly screen 01 with the ROM (run of mine) or raw material bin above it. The dozer track chain links are to prevent surges of material spilling out of the bin uncontrolled and flooding the screen and jaw crusher. Any small material will fall between the grizzly bars and bypass the Jaques single-toggle jaw crusher. GeoData.
239-21.jpg
239-2198 viewsView from the north western side of the Yandi One ROM (run of Mine) bin showing the operators cabin, Transmin rock breaker, conveyor CV2 running up hill to the left and Sub-Station 1 and the Yandi office complex beyond that on the hill. GeoData.
239-22.jpg
239-22101 viewsOverview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the screen house, radial stacker on the stockpile, power station, new and old side tertiary crushing structures, sub-station 4, the control room and on the extreme right the secondary crusher structure. GeoData.
239-23.jpg
239-23140 viewsOverview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the radial stacker on the stockpile, power station radiators, new and old side tertiary crushing structures, sub-station 4, the workshops in the background and on the secondary crusher structure. The reclaim tunnels and conveyor CV3 are visible running from the bottom of the image to the secondary crusher. GeoData.
239-24.jpg
239-24182 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train locomotive 5650 'Yawata', a Goninan rebuild GE CM40-8M model serial no. 8412-07/93-141 edging towards the load-out tunnel on the 17/01/1997. GeoData.
239-25.jpg
239-25354 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train LocoTrol equipped locomotive Goninan rebuild CM40-8ML cab-less unit, serial no. 8412-09/94-155 5664 'Kaohsiung' edging towards the load-out tunnel on the 17/01/1997. There was three of these units built without cab, they have all since had cabs fitted. GeoData.
239-26.jpg
239-26177 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train locomotives 5650 'Yawata', a Goninan rebuild GE CM40-8M model serial no. 8412-07/93-141 with a LocoTrol equipped Goninan rebuild CM40-8ML cab-less unit, serial no. 8412-09/94-155 5664 'Kaohsiung' edging towards the load-out tunnel on the 17/01/1997. GeoData.
239-27.jpg
239-27135 viewsYandi Two, conveyor belt CV202 failure of the primary crushing circuit conveyor. GeoData.
239-28.jpg
239-2896 viewsYandi Two, conveyor belt CV202 failure of the belt on the primary crushing circuit. Shows belt rolls bunched up and sub-station. GeoData.
239-29.jpg
239-29100 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls bunched up near exit from primary jaw type crusher. GeoData.
239-30.jpg
239-3098 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls bunched up near the gravity take-up tower. GeoData.
239-31.jpg
239-31112 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls dropped to ground, primary crusher control cabin, ROM bin and drive platform visible. GeoData.
239-32.jpg
239-32100 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133 with the Yandi Fines stockpile and feed conveyor and pedestal stacker visible.
239-33.jpg
239-3391 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
239-34.jpg
239-3481 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
239-35.jpg
239-3590 viewsYandi Two, cab side shot of Goninan Dash 8 unit CM40-8M 5644 'Kangan' serial 8281-09/92-133, rebuilt from AE Goodwin built ALCo M636 5471 serial G6047-3 still with ALCo Hi-Ad bogies.
239-36.jpg
239-3687 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
239-37.jpg
239-37123 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
   
38 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional