|
![Filename=041225_064625.jpg
Filesize=415KiB
Dimensions=1280x962
Date added=Jun 29, 2018 041225_064625.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_041225_064625.jpg)
041225 064625373 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon and type leader 9100 asset number 2031702. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 9100 has been set up for use as a 'test' waggon with load sensors located all over it. 25th December 2004.
|
|
![Filename=041225_064634.jpg
Filesize=400KiB
Dimensions=1280x962
Date added=Jun 29, 2018 041225_064634.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_041225_064634.jpg)
041225 064634212 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 asset number 2031703. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
|
|
![Filename=041225_064654.jpg
Filesize=398KiB
Dimensions=1280x962
Date added=Jun 29, 2018 041225_064654.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_041225_064654.jpg)
041225 064654176 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 asset number 2031703. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
|
|
![Filename=041225_064721.jpg
Filesize=404KiB
Dimensions=1280x962
Date added=Jun 29, 2018 041225_064721.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_041225_064721.jpg)
041225 064721191 viewsNelson Point Ore Car Repair Shop, original Magor USA built ore waggon 601, known as the 'Oro's', one of 144 built in 1963 and bought by the Mt Newman partners in 1968 from the Oroville Dam construction in California. 25th December 2004.
|
|
![Filename=041225_064737.jpg
Filesize=383KiB
Dimensions=1280x962
Date added=Jun 29, 2018 041225_064737.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_041225_064737.jpg)
041225 064737163 viewsNelson Point Ore Car Repair Shop, original Magor USA built ore waggon 581, known as the 'Oro's', one of 144 built in 1963 and bought by the Mt Newman partners in 1968 from the Oroville Dam construction in California. 25th December 2004.
|
|
![Filename=041225_064755.jpg
Filesize=424KiB
Dimensions=1280x962
Date added=Jun 29, 2018 041225_064755.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_041225_064755.jpg)
041225 064755176 viewsNelson Point Ore Car Repair Shop, original Magor USA built ore waggon 581, known as the 'Oro's', one of 144 built in 1963 and bought by the Mt Newman partners in 1968 from the Oroville Dam construction in California. 25th December 2004.
|
|
![Filename=041225_065025.jpg
Filesize=414KiB
Dimensions=962x1280
Date added=Jun 29, 2018 041225_065025.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_041225_065025.jpg)
041225 065025215 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 handbrake detail. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
|
|
![Filename=110620_1959r.jpg
Filesize=494KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_1959r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_1959r.jpg)
110620 1959r38 viewsWalla Siding, BHP ore waggon 9070 loaded with Yandi fines, renumbered from 2821, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. 20th of June 2011.
|
|
![Filename=110620_1965r.jpg
Filesize=701KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_1965r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_1965r.jpg)
110620 1965r39 viewsWalla Siding, comparison between two BHP ore waggons loaded with Yandi fines of the Golynx design type, 8410 was built in November 2001 for bottom discharge on the Goldsworthy system with serial number 950088-340, while 6834 was built in 2008. The burn or weld marks are still visible on 8410 from when it was in GML service, now converted for rotary service, noticed the filled in end and the angle section along the top edge for support. 20th of June 2011.
|
|
![Filename=110620_2014r.jpg
Filesize=604KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2014r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2014r.jpg)
110620 2014r30 viewsWalla Siding, comparison between two empty BHP ore waggons with the tapered floor design. 4507 was built by Transfield WA in in 1976 in an order for eighteen waggons, while 4260 is a Goninan WA build from an order of one hundred and twenty-six waggons using 3CR12 stainless steel in an effort to eliminate internal painting and reducing wear on the waggon body, these were designated HC7081. 20th of June 2011.
|
|
![Filename=110620_2019r.jpg
Filesize=627KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2019r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2019r.jpg)
110620 2019r30 viewsWalla Siding, empty BHP ore waggon 9081, renumbered from 2710, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. 20th of June 2011.
|
|
![Filename=110620_2020r.jpg
Filesize=583KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2020r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2020r.jpg)
110620 2020r25 viewsWalla Siding, empty BHP ore waggon 7000, a Goninan WA build of the Golynx design from April 2008. 20th of June 2011.
|
|
![Filename=110620_2027r.jpg
Filesize=594KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2027r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2027r.jpg)
110620 2027r28 viewsWalla Siding, empty BHP ore waggon 8422 is a Goninan WA build of the Golynx design built in May 2005 as a bottom discharge waggon for Goldsworthy service with serial number 950141-002. Now converted to rotary dump operation. 20th of June 2011.
|
|
![Filename=110620_2031r.jpg
Filesize=621KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2031r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2031r.jpg)
110620 2031r24 viewsWalla Siding, empty BHP ore waggon 8414 is a Goninan WA build of the Golynx design built in November 2001 as a bottom discharge waggon for Goldsworthy service with serial number 950088-344. Now converted to rotary dump operation. 20th of June 2011.
|
|
![Filename=110620_2040r.jpg
Filesize=587KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2040r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2040r.jpg)
110620 2040r19 viewsWalla Siding, empty BHP ore waggon 2899, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The steel panels in the ribs have been resheeted, but not the end panels. 20th of June 2011.
|
|
![Filename=110620_2042r.jpg
Filesize=579KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2042r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2042r.jpg)
110620 2042r23 viewsWalla Siding, empty BHP ore waggon 4238 is a Goninan WA build from an order of one hundred and twenty-six waggons in 1997 using 3CR12 stainless steel in an effort to eliminate internal painting and reducing wear on the waggon body, these were designated HC7081. 20th of June 2011.
|
|
![Filename=110620_2296r.jpg
Filesize=559KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2296r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2296r.jpg)
110620 2296r24 viewsWalla, loaded BHP ore waggon 1418 is a Goninan WA build to the Golynx design as a replacement body from February 2011. This replaces the original Comeng WA waggon of the same number. 20th of June 2011.
|
|
![Filename=110620_2320r.jpg
Filesize=582KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2320r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2320r.jpg)
110620 2320r20 viewsWalla, loaded BHP ore waggon 4508, one of eighteen built by Transfield WA in 1976 with a tapered floor. 20th of June 2011.
|
|
![Filename=110620_2337r.jpg
Filesize=506KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2337r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2337r.jpg)
110620 2337r20 viewsWalla, loaded BHP ore waggon 4209 is a Goninan WA build from an order of one hundred and twenty-six waggons in 1997 with a tapered floor and rounded wall bottoms using 3CR12 stainless steel in an effort to eliminate internal painting and reducing wear on the waggon body, these were designated HC7081. 20th of June 2011.
|
|
![Filename=110620_2356r.jpg
Filesize=501KiB
Dimensions=1280x853
Date added=Aug 18, 2023 110620_2356r.jpg](albums/Pilbara/BHP_Rolling_Stock_-_Ore/thumb_110620_2356r.jpg)
110620 2356r18 viewsWalla, loaded BHP ore waggon 9065, renumbered from original Comeng WA build waggon 2701 which was originally built in 1971 as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. 20th of June 2011.
|
|
88 files on 5 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
4 |
|