Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0225

Last additions - 0225
225-07.jpg
225-0765 viewsBing siding, the afternoon departure for Yandi mine heads south past the ballast consist, behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.Oct 28, 2015
225-09.jpg
225-09103 viewsBing siding, signal post BGN 3 stand sentinel as the end of the afternoon Yandi train is seen heading south with last waggon 4305, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. This design was designated HC7081. GeoData.Oct 28, 2015
225-08.jpg
225-0870 viewsBing siding, General Electric AC6000 model unit 6073 serial 51065 built at GE Erie is the mid-train remote for the afternoon empty Yandi mine train as it heads south. This was before the units were named. GeoData.Oct 28, 2015
225-03.jpg
225-0362 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach. Flashbutt yard is to the right. GeoData.Oct 28, 2015
225-06.jpg
225-0665 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie with sister unit 6075 as second unit before the locos were named. GeoData.Oct 28, 2015
225-05.jpg
225-0565 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie as it passes Goninan rebuild CM40-8M GE unit 5669. GeoData.Oct 28, 2015
225-04.jpg
225-0466 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie. Flashbutt yard is to the right. GeoData.Oct 28, 2015
225-01.jpg
225-0162 viewsWalla siding area, the East Turner River is in flood, flowing with the bridge at the 55.5 km in the background.Oct 28, 2015
225-02.jpg
225-0266 viewsBing siding at the 17.5 km, Goninan rebuild CM40-8MEFI GE loco 5669 'Beilun' serial 8412-02 / 95-160 was the last Dash 8 built for BHP Iron Ore, seen here sitting at BNN 6 signal awaiting a path, note the CCTV camera mounted under the radiator wing as a trial for single man crewing when long end leading. GeoData.Oct 28, 2015
225-00.jpg
225-0061 viewsWalla siding area, the East Turner River is in flood, flowing with the bridge at the 55.5 km in the background.Oct 28, 2015
   
30 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional