Last additions - 01-06_2018 |

180615 1497162 viewsMooka Yard, cab side of named BHP's Progress Rail built EMD SD70ACe unit 4486 'Jenny Parkinson' serial 20148001-019. 15th June 2018.
Roland Depth photo.Jun 24, 2018
|
|

180615 1411225 viewsBing Siding, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4432 'Warlu' serial 20128866-001 leads a loaded towards the port. 15th June 2018.Jun 24, 2018
|
|

180615 1472230 viewsBing South, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4455 serial 20138907-006 with 4356 second unit powers along the west mainline with a loaded rake heading for Finucane Island. 15th June 2018.Jun 24, 2018
|
|

180615 1407207 viewsBing Siding, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4432 'Warlu' serial 20128866-001 leads a loaded towards the port. 15th June 2018.Jun 24, 2018
|
|

180614 1342176 viewsGoldsworthy Junction, Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers, the straddle crane SD 1 is a new unit built by Vaia Car model no. TCR-V. GeoData. 14th June 2018.Jun 24, 2018
|
|

180614 1334182 viewsGoldsworthy Junction, Node 1 at the 17 km looking south west, new type LED tilt mast for signal GJ18. Steel train stabled at the junction. GeoData. 14th June 2018.Jun 24, 2018
|
|

180614 1333179 viewsGoldsworthy Junction, Node 1 at the 17 km looking south, new type LED tilt mast for signal GJ18. GeoData. 14th June 2018.Jun 24, 2018
|
|

180614 1332195 viewsAllen Siding, recycled rail from the Newman Mainline, a section of rail from the 222.8 km between Shaw and Hesta has made its way to the 45 km on the Goldsworthy line. GeoData. 14th June 2018.Jun 24, 2018
|
|

180614 1331197 viewsAllen Siding, the points and what remains of the point machine at the 45 km for the siding, looking east. GeoData. 14th June 2018.Jun 24, 2018
|
|

180614 1281199 viewsAllen Siding, at the 45 km looking west, the original rail or steel train is stowed on the mainline, looking from the rear lead off waggon 6203, built by Comeng WA in January 1977. The chute arrangement for the discharging and recovery of rail is visible. 14th June 2018. GeoData.Jun 24, 2018
|
|

180614 1329176 viewsAllen Siding, at the 45 km looking east, the original rail or steel train is stowed on the mainline, looking from 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible. 14th June 2018. GeoData.Jun 24, 2018
|
|

180527 1208199 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP stored redundant service waggons, the two heavy weight waggons, the original Vickers Hoskins built 6004 137.1 tonne capacity Ortner Freight Car Company design, and the much newer Gemco WA built 100 tonnes capacity waggon. 27th May 2018. GeoData.Jun 24, 2018
|
|

180527 1207186 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP has stored some redundant service waggons, flat waggon AQPY 2916 , the two heavy weight waggons, the old winch and crib waggons from the steel train and Difco side dumps. Looking west. 27th May 2018. GeoData.Jun 24, 2018
|
|

180527 1200651 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP has stored some redundant service waggons, Difco side dumps, a couple of heavy weights and the old winch and crib waggons from the steel train. Looking east with a former GML short Difco side dump waggon on the end. 27th May 2018. GeoData.Jun 24, 2018
|
|

180208 4372384 viewsCape Lambert Yard. Rear view of brand new GE built ES44ACi unit 9126 serial 64632 built date of October 2017 in the owners Rio Tinto stripe livery. 8th February 2018.
Roland Depth image.Jun 24, 2018
|
|

180208 43716858 viewsCape Lambert Yard. Brand new GE built ES44ACi unit 9126 serial 64632 built date of October 2017 in the owners Rio Tinto stripe livery. 8th February 2018.
Roland Depth image.Jun 24, 2018
|
|

180208 4370228 viewsCape Lambert Yard. Builders decal of brand new GE built ES44ACi unit 9126 serial 64632, built date of October 2017. 8th February 2018.
Roland Depth image.Jun 24, 2018
|
|

180117 1151210 viewsGreat Northern Highway, between the 18 and 18.2 km grade crossings sees Roy Hill loaded fuel train with General Electric built ES44ACi units RHA 1018 serial 63829 leading RHA 1019, CFCLA lease unit Goninan ALCo to GE rebuild CM40-8M unit CD 4302 and RHA 1013 with eleven loaded fuel tank waggons. CD 4302 is the only unit powering as it was being tested prior to mainline service. 17th January 2018.Jun 24, 2018
|
|

180117 1146653 viewsGreat Northern Highway, 18 km grade crossing sees Roy Hill loaded fuel train with General Electric built ES44ACi units RHA 1018 serial 63829 leading RHA 1019, CFCLA lease unit Goninan ALCo to GE rebuild CM40-8M unit CD 4302 and RHA 1013 with eleven loaded fuel tank waggons. CD 4302 is the only unit powering as it was being tested. 17th January 2018.Jun 24, 2018
|
|

180117 1148377 viewsGreat Northern Highway, 18 km grade crossing sees CFCLA Goninan ALCo to GE rebuild CM40-8M unit CD 4302 originally Robe River Comeng NSW built ALCo M636 serial C6103-1 #9421, rebuilt by Goninan in 1993 with serial 8297-2/93-137 then to CFCLA in 2012 powering a loaded fuel train as part of the mainline testing of these units prior to ore train service. 17th January 2018.Jun 24, 2018
|
|
|