Last additions - 0247 |

247-3787 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.Oct 28, 2020
|
|

247-3657 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.Oct 28, 2020
|
|

247-3552 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.Oct 28, 2020
|
|

247-3453 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.Oct 28, 2020
|
|

247-3365 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 and was originally an AE Goodwin built M636 ALCo serial C-6041-4 new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982, compare to second unit 9410 with a Comeng style large flat fuel tank. Location is here.22nd May 2002.Oct 28, 2020
|
|

247-3259 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Location is here.22nd May 2002.Oct 28, 2020
|
|

247-3153 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Location is here.22nd May 2002.Oct 28, 2020
|
|

247-3042 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8. Location is here.22nd May 2002.Oct 28, 2020
|
|

247-2949 viewsCape Lambert fuel point, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng build style flat fuel tank, while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.Oct 28, 2020
|
|

247-2854 viewsCape Lambert fuel point, Robe River Dash 8 power 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.Oct 28, 2020
|
|

247-2744 viewsCape Lambert fuel point, Robe River locomotive 9420 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8109-03 / 91-119 from March 1991 riding on Hi-Ad bogies and was originally an ALCo Schenectady built C630 serial 3486-4 and built new for Chesapeake & Ohio (USA) as their 2103. It is one of four C630 ALCo units purchased in 1974 and delivered to Robe in January 1975. Everything below the frame is ALCo while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.Oct 28, 2020
|
|

247-2651 viewsCape Lambert fuel point, Robe River locomotive 9420 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8109-03 / 91-119 from March 1991 riding on Hi-Ad bogies and was originally an ALCo Schenectady built C630 serial 3486-4 and built new for Chesapeake & Ohio (USA) as their 2103. It is one of four C630 ALCo units purchased in 1974 and delivered to Robe in January 1975. Everything below the frame is ALCo while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.Oct 28, 2020
|
|

247-2542 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.Oct 28, 2020
|
|

247-2451 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.Oct 28, 2020
|
|

247-2347 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.Oct 28, 2020
|
|

247-2254 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.Oct 28, 2020
|
|

247-2187 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.Oct 28, 2020
|
|

247-20109 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.Oct 28, 2020
|
|

247-19187 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper at Bells Crossing. Approximate location of train is here. 22nd May 2002.Oct 28, 2020
|
|

247-18106 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper from the South Yard at Bells Crossing. Approximate location of train is here. 22nd May 2002.Oct 28, 2020
|
|
|