Last additions - BHP_Rolling_Stock_-_Ore 9001-10000 |

9026 Comeng 030712 143315404 viewsNelson Point, empty BHP ore waggon 9026 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.Aug 18, 2023
|
|

9024 Comeng 030712 143256377 viewsNelson Point, empty BHP ore waggon 9024 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.Aug 18, 2023
|
|

9024 Comeng 030712 143247418 viewsNelson Point, empty BHP ore waggon 9024, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. This view shows the reduced gap between waggons reduced from 1084 to 934 mm to aid the aerodynamics. 12th of July 2003.Aug 18, 2023
|
|

9025 Comeng 030712 143222361 viewsNelson Point, empty BHP ore waggon 9025 with drop belly floor, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.Aug 18, 2023
|
|

9023 Comeng 030712 143051375 viewsNelson Point, empty BHP ore waggon 9023, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.Aug 18, 2023
|
|

9020 Comeng 030712 142923388 viewsNelson Point, empty BHP ore waggon 9020, the prototype leader originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.Aug 18, 2023
|
|

9021 Comeng 030712 142242391 viewsNelson Point, empty BHP ore waggon 9021, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.Aug 18, 2023
|
|

9065 Comeng 110620 2356410 viewsWalla, loaded BHP ore waggon 9065, renumbered from original Comeng WA build waggon 2701 which was originally built in 1971 as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. 20th of June 2011.Aug 18, 2023
|
|

9081 Comeng 110620 2019381 viewsWalla Siding, empty BHP ore waggon 9081, renumbered from 2710, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. 20th of June 2011.Aug 18, 2023
|
|

9070 Comeng 110620 1959425 viewsWalla Siding, BHP ore waggon 9070 loaded with Yandi fines, renumbered from 2821, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. 20th of June 2011.Aug 18, 2023
|
|

9101 Bradken 041225 065025550 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 handbrake detail. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.Jun 29, 2018
|
|

9101 Bradken 041225 064654544 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 asset number 2031703. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.Jun 29, 2018
|
|

9101 Bradken 041225 064634584 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 asset number 2031703. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.Jun 29, 2018
|
|

9100 Bradken 041225 064625772 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon and type leader 9100 asset number 2031702. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 9100 has been set up for use as a 'test' waggon with load sensors located all over it. 25th December 2004.Jun 29, 2018
|
|

9100 Bradken 041225 064557687 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon and type leader 9100 asset number 2031702 and 9101 behind it. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 9100 has been set up for use as a 'test' waggon with load sensors located all over it. 25th December 2004.Jun 29, 2018
|
|

9100 Bradken 041225 0645411094 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon and type leader 9100 asset number 2031702 and 9101 behind it. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 9100 has been set up for use as a 'test' waggon with load sensors located all over it. 25th December 2004.Jun 29, 2018
|
|

9100 Bradken 041225 064521680 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon and type leader 9100 asset number 2031702. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 9100 has been set up for use as a 'test' waggon with load sensors located all over it. 25th December 2004.Jun 29, 2018
|
|
|
|
|
|
|