Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
8003_070915_0885.jpg
8003 070915 088511 viewsRobe River diesel fuel tank waggons 8003, 8002 and 8001 running loaded at the front of an empty ore train. 8003 was built by Comeng NSW in March 1979 with a 100,000 litre capacity whilst 8002 and 8001 were built by the same builder with a 45,000 litre capacity in September 1972. At the 73.4 km on the Deepdale line, Western Creek, September 15, 2007.Aug 16, 2025
8003_070915_0883.jpg
8003 070915 08838 viewsRobe River diesel fuel tank waggon 8003 running loaded at the front of an empty ore train, built by Comeng NSW in March 1979 with a 100,000 litre capacity, at the 73.4 km on the Deepdale line, Western Creek, September 15, 2007.Aug 16, 2025
8002_1301123_3425.jpg
8002 1301123 34257 viewsRobe River diesel fuel tank waggon 8002, built by Comeng NSW in September 1972 with a 45,000 litre capacity. Rio's Seven Mile complex, November 23, 2013.Aug 16, 2025
8002_1301122_3340.jpg
8002 1301122 33408 viewsRobe River diesel fuel tank waggon 8002, built by Comeng NSW in September 1972 with a 45,000 litre capacity. Rio's Seven Mile complex, November 22, 2013.Aug 16, 2025
8002_070915_0882.jpg
8002 070915 08828 viewsRobe River diesel fuel tank waggon 8002 running loaded at the front of an empty ore train, built by Comeng NSW in September 1972 with a 45,000 litre capacity, at the 73.4 km on the Deepdale line, Western Creek, September 15, 2007.Aug 16, 2025
8001_070915_0881.jpg
8001 070915 08817 viewsRobe River diesel fuel tank waggon 8001 running loaded at the front of an empty ore train, built by Comeng NSW in September 1972 with a 45,000 litre capacity, at the 73.4 km on the Deepdale line, Western Creek, September 15, 2007.Aug 16, 2025
6001_060722_7638.jpg
6001 060722 76387 viewsRobe River ballast waggons. Robe had three built by Tomlinson Steel WA and numbered 6001 to 6003 as seen here in Cape Lambert yard. 1701 hours, July 22, 2006.Aug 16, 2025
0554_110602_1615.jpg
0554 110602 16154 viewsRobe River ore waggon 554, built by Tomlinson Steel WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.Aug 16, 2025
0553_160727_0985.jpg
0553 160727 09852 viewsRobe River ore waggon 553, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.Aug 16, 2025
0553_160306_1332.jpg
0553 160306 13322 viewsRobe River ore waggon 553, built by Tomlinson Steel WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.Aug 16, 2025
0550_160306_1247.jpg
0550 160306 12472 viewsRobe River ore waggon 550, built by Tomlinson Steel WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.Aug 16, 2025
0547_170729_0197.jpg
0547 170729 01970 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.Aug 16, 2025
0547_170513_8696.jpg
0547 170513 86963 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, handbrake side loaded view, Cape Lambert yard, May 13, 2017.Aug 16, 2025
0547_160727_0974.jpg
0547 160727 09744 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.Aug 16, 2025
0547_141124_6784.jpg
0547 141124 67842 viewsRobe River ore waggon 547, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.Aug 16, 2025
0546_160727_0967.jpg
0546 160727 09673 viewsRobe River ore waggon 546, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.Aug 16, 2025
0544_160306_1460.jpg
0544 160306 14603 viewsRobe River ore waggon 544, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.Aug 16, 2025
0540_160306_1329.jpg
0540 160306 13292 viewsRobe River ore waggon 540, built by Tomlinson Steel WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.Aug 16, 2025
0539_060722_7608.jpg
0539 060722 76084 viewsRobe River ore waggon 539, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.Aug 16, 2025
0538_170513_8761.jpg
0538 170513 87612 viewsRobe River ore waggon 534, built by Tomlinson Steel WA, handbrake side partially loaded view, Cape Lambert yard, May 13, 2017.Aug 16, 2025
4716 files on 236 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional