Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
255-26.jpg
255-269 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85 and sisters 9410, 9420 and 9414. Geodata location here. May 2002.Sep 12, 2021
255-25.jpg
255-2510 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up. Geodata location here. May 2002.Sep 12, 2021
255-24.jpg
255-2411 viewsWestern Creek, looking south alongside the Robe River interconnecting line with the Western Creek bridge, on the right is the Hamersley Iron Dampier to Tom Price line. Geodata location here. May 2002.Sep 12, 2021
255-23.jpg
255-2310 viewsWestern Creek, looking south alongside the Robe River interconnecting line with the Western Creek bridge, in the far background the pole line is the Hamersley Iron Dampier to Tom Price line. Geodata location here. May 2002.Sep 12, 2021
255-22.jpg
255-229 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.Sep 12, 2021
255-21.jpg
255-218 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.Sep 12, 2021
255-20.jpg
255-209 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.Sep 12, 2021
255-19.jpg
255-1910 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.Sep 12, 2021
255-18.jpg
255-1810 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.Sep 12, 2021
255-17.jpg
255-1711 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.Sep 12, 2021
255-16.jpg
255-169 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.Sep 12, 2021
255-15.jpg
255-1510 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.Sep 12, 2021
255-14.jpg
255-148 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left while the Deepdale line is on the right. Geodata location here. May 2002.Sep 12, 2021
255-13.jpg
255-139 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale line is on the right. Geodata location here. May 2002.Sep 12, 2021
255-12.jpg
255-1211 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.Sep 12, 2021
255-11.jpg
255-1110 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.Sep 12, 2021
255-10.jpg
255-1010 viewsSiding Three looking south at the south end signal for loaded trains or up movements. Various cabinets and DD or dragging equipment detector bars. May 2002.Sep 12, 2021
255-09.jpg
255-099 viewsSiding Three looking south at the south end points, switch machine and various cabinets and solar panels and DD or dragging equipment detector bars. May 2002.Sep 12, 2021
255-08.jpg
255-0810 viewsSiding Three, swing nose point machine on the south end points riding on concrete sleepers at the 134.7 km. May 2002.Sep 12, 2021
255-07.jpg
255-079 viewsSiding Three looking south along the Cape Lambert to Deepdale mainline at the south end signal for the mainline, passing track is on the right with points in the distance. May 2002.Sep 12, 2021
3610 files on 181 page(s) 14

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional