Last additions - Pilbara negative and digital Albums - Iron Ore |

234-01112 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. As this series of rebuilds has no marker lights not the red lantern attached to the hand rail. Circa 1998.Mar 21, 2016
|
|

233-3781 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.Mar 21, 2016
|
|

233-3595 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4157, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.Mar 21, 2016
|
|

233-3688 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4161, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.Mar 21, 2016
|
|

233-3482 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.Mar 21, 2016
|
|

233-3379 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5642 'Wallareenya' serial 8281-07 / 92-131 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. GeoData.Mar 21, 2016
|
|

233-3276 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.Mar 21, 2016
|
|

233-3180 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.Mar 21, 2016
|
|

233-2976 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.Mar 21, 2016
|
|

233-3081 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5642 'Wallareenya' serial 8281-07 / 92-131 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. GeoData.Mar 21, 2016
|
|

233-2779 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.Mar 21, 2016
|
|

233-2878 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.Mar 21, 2016
|
|

233-2578 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.Mar 21, 2016
|
|

233-2678 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train around at 1.2 km/h with assistance from two sister units, the end of the 112 waggon or one rake consist can be seen in the middle background. GeoData.Mar 21, 2016
|
|

233-2477 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.Mar 21, 2016
|
|

233-2385 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.Mar 21, 2016
|
|

233-2181 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.Mar 21, 2016
|
|

233-2273 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.Mar 21, 2016
|
|

233-2079 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.Mar 21, 2016
|
|

233-1989 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.Mar 21, 2016
|
|
3720 files on 186 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
141 |  |
 |
 |
 |
 |
 |
 |
|