Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
221-26.jpg
221-2691 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
221-25.jpg
221-2585 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
221-24.jpg
221-2484 viewsYandi One mine loadout balloon loop, overview of the stockpile, the train can be seen in the middle distance on the right.Sep 19, 2015
221-23.jpg
221-2390 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
221-22.jpg
221-2284 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
221-21.jpg
221-2180 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.Sep 19, 2015
221-20.jpg
221-20132 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.Sep 19, 2015
221-19.jpg
221-19117 viewsHardie Siding, Tomlinson Steel cars make up the bulk of the fleet and the rear portions of the Goldsworthy Line trains.Sep 19, 2015
221-18.jpg
221-18115 viewsHardie Siding, as the train continues, Gunderson USA smooth sided cars and Portec USA ribbed sided cars make up the front portion of the train.Sep 19, 2015
221-17.jpg
221-17124 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.Sep 19, 2015
221-16.jpg
221-16136 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.Sep 19, 2015
221-15.jpg
221-15141 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.Sep 19, 2015
221-14.jpg
221-14139 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.Sep 19, 2015
221-13.jpg
221-13131 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02 is backing out onto the mainline with an empty train that will continue onto Yarrie for loading.Sep 19, 2015
221-12.jpg
221-12127 viewsHardie Siding, with the switch now set for the siding, the empty train is reversing out back onto the mainline, the ore cars are Tomlinson Steel built bottom discharge units.Sep 19, 2015
221-11.jpg
221-11150 viewsHardie Siding, with the switch now set for the siding, the empty train is reversing out back onto the mainline, the ore cars are Tomlinson Steel built bottom discharge units. Note the end of train device are two flashing red lights, and no digitair.Sep 19, 2015
221-10.jpg
221-10138 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 heads away from Hardie past the location equipment and the train crew shelter with a loaded train bound for Finucane Island.Sep 19, 2015
221-09.jpg
221-09242 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
221-08.jpg
221-08147 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
221-07.jpg
221-07152 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
3683 files on 185 page(s) 172

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional