Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
141027_5827.jpg
141027 58271409 viewsWedgefield, Sell and Parker's metal recycling yard, with what remains of an SD40R and prime mover having the frame cut into three pieces, as the once mighty GE AC6000 6073 and SD40R 3091 wait their turn to ne reduced to scrap.Oct 27, 2014
141027_5825.jpg
141027 58251315 viewsWedgefield, view out the back of Sell and Parker's metal recycling yard shows a sorry sight. From left is the frame of an SD40R and prime mover, AC6000 6073, SD40R 3091, AC6000 6075 and SD40 3079. Beside 3079 is the remains of AC6000 unit 6071 having been reduced from one of the most powerful locomotives to work in Australia to a munched up tangled mass of metal, the EVO motor is still in the frame.Oct 27, 2014
141025_5819.jpg
141025 58192313 viewsWedgefield, WA, view from the new bypass road looking into the rear of Sell and Parker's metal recycling yard with former BHP Billiton Iron Ore EMD SD40 and SD40R model units lined up awaiting their fate, from left, SD40 3080, SD40R 3097, SD40 3078 and SD40R 3088.Oct 27, 2014
141025_5822.jpg
141025 58221209 viewsWedgefield, WA, view from the new bypass road looking into the rear of Sell and Parker's metal recycling yard with former BHP Billiton Iron Ore EMD SD40R and GE AC6000 model units lined up awaiting their fate, from left, EMD SD40R 3091, AC6000 6073 and remains of another SD40R.Oct 27, 2014
141025_5821.jpg
141025 58211102 viewsWedgefield, WA, view from the new bypass road looking into the rear of Sell and Parker's metal recycling yard with former BHP Billiton Iron Ore EMD SD40R and GE AC6000 model units lined up awaiting their fate, from left, AC6000 6075, SD40R 3091, AC6000 6073 and remains of another SD40R.Oct 27, 2014
141025_5820.jpg
141025 58201252 viewsWedgefield, WA, view from the new bypass road looking into the rear of Sell and Parker's metal recycling yard with former BHP Billiton Iron Ore EMD SD40R and GE AC6000 model units lined up awaiting their fate, from left, EMD SD40R 3088, 3086, 3094, AC6000 6075, SD40R 3091.Oct 27, 2014
141025_5818.jpg
141025 58181538 viewsWedgefield, WA, view from the new bypass road looking into the rear of Sell and Parker's metal recycling yard with former BHP Billiton Iron Ore EMD SD40, SD40R and GE AC6000 model units lined up awaiting their fate, from left, EMD SD40 3080, SD40R 3097, SD40 3078, SD40R 3088, 3086, 3094, AC6000 6075, SD40R 3091, AC6000 6073 and remains of another SD40R.Oct 27, 2014
207-31.jpg
207-31138 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M serial 4839-02 / 88-078, cab front view, with rear of empty train in siding.Oct 01, 2014
207-30.jpg
207-30122 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M serial 4839-02 / 88-078, cab front view, with rear of empty train in siding.Oct 01, 2014
207-29.jpg
207-29129 viewsHardie Siding, BHP Goninan GE rebuild CM40-8MEFI unit 5669 'Builen' serial 8412-02 / 95-160 runs down the passing track, USA built Gunderson smooth sided ore cars ex Phelps Dodge Copper Mine.Oct 01, 2014
207-28.jpg
207-28223 viewsHardie Siding, the days of the C36-7M or Dash 7 units running the Goldsworthy line are almost over, as the CM40-8M or Dash 8 variants take up the task following the arrival of the AC6000 class units. Here, CM40-8MEFI unit 5669 'Beilun' takes the passing track with an empty as C36-7M unit 5513 holds the mainline with a loaded.Oct 01, 2014
207-26.jpg
207-26129 viewsHardie Siding, BHP unit 5669 'Builen' is the highest numbered CM40-8MEFI rebuild by Goninan, serial 8412-02 / 95-160, leading an empty train pauses to allow the 2nd person to alight and set the road for the passing track. Oct 01, 2014
207-27.jpg
207-27127 viewsHardie Siding, BHP unit 5669 'Builen' serial 8412-02 / 95-160 is the highest numbered CM40-8MEFI rebuild by Goninan in the BHP roster, leading an empty train as it takes the passing track to effect a cross.Oct 01, 2014
207-25.jpg
207-25207 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, with 'Kalgan' nameboards removed for fitting to AC6000 class 6074, holds the main with a loaded Yarrie train awaiting a cross.Oct 01, 2014
207-24.jpg
207-24150 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, with 'Kalgan' nameboards removed for fitting to AC6000 class 6074, holds the main with a loaded Yarrie train awaiting a cross.Oct 01, 2014
207-23.jpg
207-23141 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, with 'Kalgan' nameboards removed for fitting to AC6000 class 6074, holds the main with a loaded Yarrie train awaiting a cross.Oct 01, 2014
207-22.jpg
207-22224 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, cab front view.Oct 01, 2014
207-21.jpg
207-21148 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, with 'Kalgan' nameboards removed for fitting to AC6000 class 6074, holds the main with a loaded Yarrie train awaiting a cross.Oct 01, 2014
207-20.jpg
207-20197 viewsBHP General Electric built AC6000 unit 6071 serial 51063 brand new and unnamed on the loaded side of Yandi One load-out loop as a remote mid-train unit, showing roof view and the original style windscreen protectors.Oct 01, 2014
207-19.jpg
207-19237 viewsBHP General Electric built AC6000 unit 6071 serial 51063 brand new and unnamed on the loaded side of Yandi One load-out loop as a remote mid-train unit, showing roof view and the original style windscreen protectors.Oct 01, 2014
3610 files on 181 page(s) 177

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional