Last additions - Pilbara negative and digital Albums - Iron Ore |

242-08667 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5508 serial 4839-04 / 87-073 about to be trucked to United Goninan Perth for eventual overhaul and repainting into the Pilbara Rail livery and leased to Pilbara Rail re-numbered 5052 as a shunt unit at Dampier. May 2002.Jan 23, 2018
|
|

242-07772 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5508 serial 4839-04 / 87-073 about to be trucked to United Goninan Perth for eventual overhaul and repainting into the Pilbara Rail livery and leased to Pilbara Rail re-numbered 5052 as a shunt unit at Dampier. May 2002.Jan 23, 2018
|
|

242-06785 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5508 serial 4839-04 / 87-073 about to be trucked to United Goninan Perth for eventual overhaul and repainting into the Pilbara Rail livery and leased to Pilbara Rail re-numbered 5052 as a shunt unit at Dampier. May 2002.Jan 23, 2018
|
|

242-05855 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.Jan 23, 2018
|
|

242-03549 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.Jan 23, 2018
|
|

242-04521 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.Jan 23, 2018
|
|

242-02552 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.Jan 23, 2018
|
|

242-01896 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.Jan 23, 2018
|
|

241-09743 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to 5510 following collision repairs. June 2002.Jan 23, 2018
|
|

171121 0973412 viewsBarker Siding, Loram rail grinder MPC 2, driving and generator end of a converted 85 foot waggon. 21st November 2017.Dec 06, 2017
|
|

171121 0971445 viewsBarker Siding, Loram rail grinder MPC 2, this was sent out from the USA where it was operational as LMIX 602 for Loram. The generator and driving cab look to be fitted to an 85 foot piggy back waggon. 21st November 2017.Dec 06, 2017
|
|

171121 0970419 viewsBarker Siding, Loram rail grinder MPC 2, this was sent out from the USA where it was operational as LMIX 602 for Loram. The generator and driving cab look to be fitted to an 85 foot piggy back waggon. 21st November 2017.Dec 06, 2017
|
|

171121 0968444 viewsBarker Siding, Loram rail grinder MPC 2, driving and generator car or waggon. Looks to be a converted 85 foot waggon. This used to be operational in the US as LMIX 602. 21st November 2017.Dec 06, 2017
|
|

171121 0969446 viewsBarker Siding, Loram rail grinder MPC 2, driving and generator end of a converted 85 foot waggon. 21st November 2017.Dec 06, 2017
|
|

171121 0967443 viewsBarker Siding, Loram rail grinder MPC 2, grinder cart. 21st November 2017.Dec 06, 2017
|
|

171121 0966451 viewsBarker Siding, Loram rail grinder MPC 2, control and grinder car. 21st November 2017.Dec 06, 2017
|
|

171121 0965445 viewsBarker Siding which is the ballast loading point, one of two FMG ballast plough waggons BP 02, built in China by CSR at the Yangtze Rolling Stock Company in 2010 on the south end of a ballast rake. 21st November 2017.Dec 06, 2017
|
|

171121 0964430 viewsBarker Siding, Loram rail grinder MPC 2, control and grinder car. 21st November 2017.Dec 06, 2017
|
|

171121 0960440 viewsBarker Siding, FMG's ballast loading single ended siding, stabled are the Loram MPC 2 grinder and the FMG ballast waggon set. 21st November 2017.Dec 06, 2017
|
|

171121 0963408 viewsBarker Siding, Loram rail grinder MPC 2, grinder cart. 21st November 2017.Dec 06, 2017
|
|
| 6292 files on 315 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
195 |  |
 |
 |
 |
 |
 |
 |
|