Last additions - Pilbara negative and digital Albums - Iron Ore |

227-05237 viewsNelson Point, view along B berth with Shiploader 1, this loader has since been replaced. In the distance now are berths E and F, Redbank Powerstation can be seen in the distance. GeoData.Nov 13, 2015
|
|

227-03250 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.Nov 13, 2015
|
|

227-04248 viewsNelson Point, looking across with Anderson Point on the left and Stanley Point on the right, Boodarie workshop can be made out with a train in front of it. Today this view is very different!! GeoData.Nov 13, 2015
|
|

227-01237 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.Nov 13, 2015
|
|

227-02225 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.Nov 13, 2015
|
|

226-37258 viewsShaw siding back track, 219 km, a defected waggon has been cut off a loaded Yandi train, waggon 1567 is a Comeng WA build from a batch of 288 built in 1974. GeoData.Nov 13, 2015
|
|

226-36264 viewsShaw siding 219 km, 5654 'Kashima' serial 8412-11 / 93-145 is the trail or slave remote on the mid-train pair of units, note the large flat fuel tank indicating this unit was a Comeng NSW built ALCo before rebuild. GeoData.Nov 13, 2015
|
|

226-35260 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the CCTV camera is visible under the radiator wing, this was a trial for single man crewing when operating long end lead, also note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.Nov 13, 2015
|
|

226-34240 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the vinyl windscreen protectors are fitted to the windscreens, note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.Nov 13, 2015
|
|

226-33225 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.Nov 13, 2015
|
|

226-32225 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.Nov 13, 2015
|
|

226-31223 viewsShaw siding, the loaded train heading north around the 698 metre radius curve behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons. GeoData.Nov 13, 2015
|
|

226-30214 viewsShaw siding, the loaded train heading north behind two Goninan CM40-8M GE rebuild units with loaded Comeng WA built waggons and a couple of the smooth sided experimental Comeng waggons. GeoData.Nov 13, 2015
|
|

226-29261 viewsShaw siding, the loaded train is winning the climb as second unit 5636 'Munda' serial 8151-11 / 91-122 another Goninan CM40-8M GE rebuild assists in powering the train to port. GeoData.Nov 13, 2015
|
|

226-28227 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
|
|

226-26227 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
|
|

226-27214 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
|
|

226-25229 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.Nov 13, 2015
|
|

226-24225 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.Nov 13, 2015
|
|

226-23231 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.Nov 13, 2015
|
|