Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
203-10.jpg
203-10373 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-08.jpg
203-08390 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
203-09.jpg
203-09373 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-07.jpg
203-07385 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
203-06.jpg
203-06409 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. Cab side view with name board and steerable bogie.Aug 16, 2014
203-05.jpg
203-05409 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working.Aug 16, 2014
203-04.jpg
203-04578 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-01.jpg
203-01356 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
203-03.jpg
203-03431 viewsBing Siding, an empty train behind a pair of BHP General Electric AC6000 units 6076 'Mt Goldsworthy' serial 51068 and class leader 6070 'Port Hedland' serial 51062 run around the passing track up to the departure signal.Aug 16, 2014
203-02.jpg
203-02372 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
203-00.jpg
203-00416 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
197-08.jpg
197-08350 viewsGoldsworthy Junction, looking east, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081, note the CCTV camera mounted under the radiator wing.Jul 22, 2014
197-07.jpg
197-07347 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-06.jpg
197-06326 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-05.jpg
197-05368 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-04.jpg
197-04380 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-03.jpg
197-03325 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.Jul 22, 2014
197-02.jpg
197-02354 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.Jul 22, 2014
197-01.jpg
197-01359 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.Jul 22, 2014
196-17.jpg
196-17382 viewsYandi Two loaded car side of the loadout balloon loop, loaded train departing behind BHP Iron Ore triple CM40-8M units, 5662 'Port Kembla' serial 8412-07 / 94-153 rebuilt by Goninan in 1994 from Comeng NSW built ALCo M636C number 5490 serial C6084-6 from 1974, leading two similar sister units. May 1998.May 21, 2014
4716 files on 236 page(s) 235

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional