Last additions - Pilbara negative and digital Albums - Iron Ore |

223-04466 viewsRosella Siding, old Hamersley Iron machine transporter, prime mover is a KW Dart, possibly a model DE 2551. 21st October 2000.Oct 25, 2015
|
|

223-07757 viewsPossum Siding, Hamersley Iron rail grinder, Speno built RR 48 M-1 model sits in the back track siding. 21st October 2000.Oct 25, 2015
|
|

223-06387 viewsRosella Siding, old Hamersley Iron machine transporter, prime mover is a KW Dart, possibly a model DE 2551. 21st October 2000.Oct 25, 2015
|
|

223-05395 viewsRosella Siding, old Hamersley Iron machine transporter, prime mover is a KW Dart, possibly a model DE 2551. 21st October 2000.Oct 25, 2015
|
|

223-03294 viewsRosella Siding, the HI Access Road and locked gate sign with the Toy Titan HJ75 Toyota Landcruiser. 21st October 2000.Oct 25, 2015
|
|

223-02296 viewsRosella Siding, the HI Access Road and locked gate sign with the Toy Titan HJ75 Toyota Landcruiser. 21st October 2000.Oct 25, 2015
|
|

223-01374 viewsThe HI red dot logo for Hamersley Iron on a sign near Rosella Siding. 21st October 2000.Oct 25, 2015
|
|

221-37264 viewsYandi One mine loadout balloon loop, front on view of near new General Electric AC6000 unit 6074 serial 51066 as it loads a train.Sep 19, 2015
|
|

221-36254 viewsYandi One mine loadout balloon loop, front on view of near new General Electric AC6000 unit 6074 serial 51066 as it loads a train.Sep 19, 2015
|
|

221-35263 viewsYandi One mine loadout balloon loop, view out the cab window from near new General Electric AC6000 unit 6074 serial 51066.Sep 19, 2015
|
|

221-34261 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
|
|

221-33246 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
|
|

221-32261 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
|
|

221-31244 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
|
|

221-30245 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
|
|

221-29247 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.Sep 19, 2015
|
|

221-28266 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.Sep 19, 2015
|
|

221-27233 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.Sep 19, 2015
|
|

221-26244 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
|
|

221-25243 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
|
|
5541 files on 278 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
264 |  |
 |
 |
 |
 |
 |
 |
|