Last additions - Pilbara negative and digital Albums - Iron Ore |

221-24267 viewsYandi One mine loadout balloon loop, overview of the stockpile, the train can be seen in the middle distance on the right.Sep 19, 2015
|
|

221-23268 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
|
|

221-22240 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
|
|

221-21217 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.Sep 19, 2015
|
|

221-20317 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.Sep 19, 2015
|
|

221-19286 viewsHardie Siding, Tomlinson Steel cars make up the bulk of the fleet and the rear portions of the Goldsworthy Line trains.Sep 19, 2015
|
|

221-18250 viewsHardie Siding, as the train continues, Gunderson USA smooth sided cars and Portec USA ribbed sided cars make up the front portion of the train.Sep 19, 2015
|
|

221-17295 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.Sep 19, 2015
|
|

221-16304 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.Sep 19, 2015
|
|

221-15294 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.Sep 19, 2015
|
|

221-14290 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.Sep 19, 2015
|
|

221-13301 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02 is backing out onto the mainline with an empty train that will continue onto Yarrie for loading.Sep 19, 2015
|
|

221-12291 viewsHardie Siding, with the switch now set for the siding, the empty train is reversing out back onto the mainline, the ore cars are Tomlinson Steel built bottom discharge units.Sep 19, 2015
|
|

221-11322 viewsHardie Siding, with the switch now set for the siding, the empty train is reversing out back onto the mainline, the ore cars are Tomlinson Steel built bottom discharge units. Note the end of train device are two flashing red lights, and no digitair.Sep 19, 2015
|
|

221-10303 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 heads away from Hardie past the location equipment and the train crew shelter with a loaded train bound for Finucane Island.Sep 19, 2015
|
|

221-09439 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
|
|

221-08313 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
|
|

221-07322 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
|
|

221-06318 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.Sep 19, 2015
|
|

221-05311 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.Sep 19, 2015
|
|
5541 files on 278 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
265 |  |
 |
 |
 |
 |
 |
 |
|