Last additions - Pilbara negative and digital Albums - Iron Ore |

229-27307 viewsYandi Two loadout exit side, Goninan rebuild CM40-8M GE units 5650 'Yawata' serial 8412-07 / 93-141 and sister unit 5642 drag a loading train at 1.2 km/h, both units carry the BHP Iron Ore teal and marigold livery for the logo. GeoData.Nov 13, 2015
|
|

229-28290 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 with sister unit 5642 drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.Nov 13, 2015
|
|

229-25311 viewsYandi Two loadout exit side, Goninan rebuild CM40-8M GE units 5650 'Yawata' serial 8412-07 / 93-141 and sister unit 5642 drag a loading train at 1.2 km/h, both units carry the BHP Iron Ore teal and marigold livery for the logo. GeoData.Nov 13, 2015
|
|

229-26326 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 with sister unit 5642 drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.Nov 13, 2015
|
|

229-24299 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister unit drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan, on the left the mid-train remotes can just be made out. GeoData.Nov 13, 2015
|
|

229-23320 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.Nov 13, 2015
|
|

229-22305 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.Nov 13, 2015
|
|

229-21292 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.Nov 13, 2015
|
|

229-20321 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.Nov 13, 2015
|
|

229-19284 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.Nov 13, 2015
|
|

229-18336 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.Nov 13, 2015
|
|

229-17325 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.Nov 13, 2015
|
|

229-16325 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.Nov 13, 2015
|
|

229-15328 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.Nov 13, 2015
|
|

229-14316 viewsYandi Two loadout, looking through the tunnel and the CM40-8M profile of 5650 can be just made out, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, Yandi Two features to loadout vaults for extra capacity, in later years it allowed two different products, fines and lumps to be stacked. GeoData.Nov 13, 2015
|
|

229-13332 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151. GeoData.Nov 13, 2015
|
|

229-12334 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit, cab side. GeoData.Nov 13, 2015
|
|

229-11346 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.Nov 13, 2015
|
|

229-10312 viewsYandi Two at the 311.5 km, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5660 on the right is the lead controlling remote, while 5657 on the left is the slave remote. GeoData.Nov 13, 2015
|
|

229-09311 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit. GeoData.Nov 13, 2015
|
|
6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
278 |  |
 |
 |
 |
 |
 |
 |
|