Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
203-10.jpg
203-10482 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-08.jpg
203-08584 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
203-09.jpg
203-09512 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-07.jpg
203-07512 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
203-06.jpg
203-06565 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. Cab side view with name board and steerable bogie.Aug 16, 2014
203-05.jpg
203-05534 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working.Aug 16, 2014
203-04.jpg
203-04696 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-01.jpg
203-01498 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
203-03.jpg
203-03579 viewsBing Siding, an empty train behind a pair of BHP General Electric AC6000 units 6076 'Mt Goldsworthy' serial 51068 and class leader 6070 'Port Hedland' serial 51062 run around the passing track up to the departure signal.Aug 16, 2014
203-02.jpg
203-02514 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
203-00.jpg
203-00568 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
197-08.jpg
197-08472 viewsGoldsworthy Junction, looking east, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081, note the CCTV camera mounted under the radiator wing.Jul 22, 2014
197-07.jpg
197-07468 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-06.jpg
197-06444 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-05.jpg
197-05500 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-04.jpg
197-04488 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.Jul 22, 2014
197-03.jpg
197-03440 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.Jul 22, 2014
197-02.jpg
197-02464 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.Jul 22, 2014
197-01.jpg
197-01476 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.Jul 22, 2014
196-17.jpg
196-17523 viewsYandi Two loaded car side of the loadout balloon loop, loaded train departing behind BHP Iron Ore triple CM40-8M units, 5662 'Port Kembla' serial 8412-07 / 94-153 rebuilt by Goninan in 1994 from Comeng NSW built ALCo M636C number 5490 serial C6084-6 from 1974, leading two similar sister units. May 1998.May 21, 2014
6096 files on 305 page(s) 304

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional