Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
203-24.jpg
203-24458 viewsBing Siding, min-train unit on an empty Yandi working BHP General Electric built AC6000 6077 'Nimingarra' serial 51069 with the second style of PVC type windscreen protectors fitted.Aug 16, 2014
203-23.jpg
203-23454 viewsBing Siding, empty train waggons over the Bing South switch, two Golynx waggons can be identified by their smooth sides.Aug 16, 2014
203-22.jpg
203-22412 viewsBing Siding, empty train behind a pair of General Electric AC6000 units powers around the curve. Note the ladder on the original Comeng style waggon.Aug 16, 2014
203-21.jpg
203-21421 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 leading class leader 6070 'Port Hedland' serial 51062 as they power their train out of the passing track at Bing South.Aug 16, 2014
203-20.jpg
203-20502 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 leading class leader 6070 'Port Hedland' serial 51062 as they power their train out of the passing track at Bing South.Aug 16, 2014
203-19.jpg
203-19538 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 powers its' train out of the passing track at Bing South.Aug 16, 2014
203-18.jpg
203-18541 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 powers its' train out of the passing track at Bing South.Aug 16, 2014
203-17.jpg
203-17540 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 powers its' train out of the passing track at Bing South.Aug 16, 2014
203-16.jpg
203-16535 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 powers its' train out of the passing track at Bing South.Aug 16, 2014
203-15.jpg
203-15567 viewsBing Siding, a loaded BHP Iron Ore train with double Dash 8 power behind Goninan rebuilds to GE CM40-8M models 5660 'Kure' serial 8412-05 / 94-151 and sister 5643 'Mt Whaleback' serial no 8281-08 / 92-132 as run along the mainline past an empty train.Aug 16, 2014
203-14.jpg
203-14580 viewsBing Siding, a loaded BHP Iron Ore train with double Dash 8 power behind Goninan GE rebuild CM40-8M models 5660 'Kure' serial 8412-05 / 94-151 and sister 5643 'Mt Whaleback' serial no 8281-08 / 92-132 as they cross an empty train in the siding with an AC6000 unit.Aug 16, 2014
203-13.jpg
203-13543 viewsBing Siding, a loaded BHP Iron Ore train with a pair of CM40-8M units on the lead are on the mainline as the cross the empty train behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068.Aug 16, 2014
203-12.jpg
203-12564 viewsBing Siding, BHP Iron Ore General Electric AC6000 model 6076 'Mt Goldsworthy' serial 51068 with an empty train. Cab side view with name board, steerable bogie and Driver Cosgrove at the controls.Aug 16, 2014
203-11.jpg
203-11631 viewsBing Siding, BHP Iron Ore General Electric AC6000 model 6076 'Mt Goldsworthy' serial 51068 with an empty train. Cab side view with name board, steerable bogie and Driver Cosgrove at the controls.Aug 16, 2014
203-10.jpg
203-10557 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-08.jpg
203-08630 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
203-09.jpg
203-09573 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-07.jpg
203-07566 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
203-06.jpg
203-06615 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. Cab side view with name board and steerable bogie.Aug 16, 2014
203-05.jpg
203-05603 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working.Aug 16, 2014
6270 files on 314 page(s) 312

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional