Last additions - Pilbara negative and digital Albums - Iron Ore |
180527 1208181 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP stored redundant service waggons, the two heavy weight waggons, the original Vickers Hoskins built 6004 137.1 tonne capacity Ortner Freight Car Company design, and the much newer Gemco WA built 100 tonnes capacity waggon. 27th May 2018. GeoData.Jun 24, 2018
|
|
180527 1207174 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP has stored some redundant service waggons, flat waggon AQPY 2916 , the two heavy weight waggons, the old winch and crib waggons from the steel train and Difco side dumps. Looking west. 27th May 2018. GeoData.Jun 24, 2018
|
|
180527 1200632 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP has stored some redundant service waggons, Difco side dumps, a couple of heavy weights and the old winch and crib waggons from the steel train. Looking east with a former GML short Difco side dump waggon on the end. 27th May 2018. GeoData.Jun 24, 2018
|
|
180208 4372360 viewsCape Lambert Yard. Rear view of brand new GE built ES44ACi unit 9126 serial 64632 built date of October 2017 in the owners Rio Tinto stripe livery. 8th February 2018.
Roland Depth image.Jun 24, 2018
|
|
180208 43716294 viewsCape Lambert Yard. Brand new GE built ES44ACi unit 9126 serial 64632 built date of October 2017 in the owners Rio Tinto stripe livery. 8th February 2018.
Roland Depth image.Jun 24, 2018
|
|
180208 4370212 viewsCape Lambert Yard. Builders decal of brand new GE built ES44ACi unit 9126 serial 64632, built date of October 2017. 8th February 2018.
Roland Depth image.Jun 24, 2018
|
|
180117 1151197 viewsGreat Northern Highway, between the 18 and 18.2 km grade crossings sees Roy Hill loaded fuel train with General Electric built ES44ACi units RHA 1018 serial 63829 leading RHA 1019, CFCLA lease unit Goninan ALCo to GE rebuild CM40-8M unit CD 4302 and RHA 1013 with eleven loaded fuel tank waggons. CD 4302 is the only unit powering as it was being tested prior to mainline service. 17th January 2018.Jun 24, 2018
|
|
180117 1146634 viewsGreat Northern Highway, 18 km grade crossing sees Roy Hill loaded fuel train with General Electric built ES44ACi units RHA 1018 serial 63829 leading RHA 1019, CFCLA lease unit Goninan ALCo to GE rebuild CM40-8M unit CD 4302 and RHA 1013 with eleven loaded fuel tank waggons. CD 4302 is the only unit powering as it was being tested. 17th January 2018.Jun 24, 2018
|
|
180117 1148357 viewsGreat Northern Highway, 18 km grade crossing sees CFCLA Goninan ALCo to GE rebuild CM40-8M unit CD 4302 originally Robe River Comeng NSW built ALCo M636 serial C6103-1 #9421, rebuilt by Goninan in 1993 with serial 8297-2/93-137 then to CFCLA in 2012 powering a loaded fuel train as part of the mainline testing of these units prior to ore train service. 17th January 2018.Jun 24, 2018
|
|
241-3792 viewsNelson Point, Car Dumper 2 holding roads, two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.Feb 19, 2018
|
|
241-3672 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.Feb 19, 2018
|
|
241-3566 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.Feb 19, 2018
|
|
241-3469 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist. June 2002.Feb 19, 2018
|
|
241-3375 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist with the Ore Car Repair Shop in the background. June 2002.Feb 19, 2018
|
|
241-3178 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5649 'Pohang' and 5640 'Ethel Creek' wait their turn through the dumper to discharge. June 2002.Feb 19, 2018
|
|
241-3276 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.Feb 19, 2018
|
|
241-3072 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.Feb 19, 2018
|
|
241-2971 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5649 'Pohang' and 5640 'Ethel Creek' wait their turn through the dumper to discharge. June 2002.Feb 19, 2018
|
|
241-2767 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096--4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Drivers side front view of the cab with pilot missing. June 2002.Feb 19, 2018
|
|
241-2866 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.Feb 19, 2018
|
|
3683 files on 185 page(s) |
|
|
|
|
|
|
|
|
59 | |
|
|
|
|
|
|
|