Last additions - Pilbara negative and digital Albums - Iron Ore |

180615 1574128 viewsWalla Siding, BHP took delivery of two new ballast ploughs in December 2017. They were built by CRRC Yangtze China in 2017 and weigh in at 65 tonnes. The ploughs are numbered BP 01 and BP 02. We finally caught up with them top and tail on a ballast consist, here's BP 02.
Roland Depth photo.Jun 24, 2018
|
|

180615 1520159 viewsWalla Siding, another named Progress Rail built EMD SD70ACe model 4478 'Ivan Butson' serial 20148001-011. 15th June 2018.
Toad Montgomery photo.Jun 24, 2018
|
|

180615 1518146 viewsWalla Siding, another named Progress Rail built EMD SD70ACe model 4478 'Ivan Butson' serial 20148001-011 leads sister 4467 with a loaded train. 15th June 2018.Jun 24, 2018
|
|

180615 1513142 viewsIndee Station road grade crossing 53.3 km, loaded Roy Hill mid-train units General Electric built ES44ACi model RHA 1014 serial 62586 and sister unit RHA 1004. GeoData. 15th June 2018.Jun 24, 2018
|
|

180615 1507144 viewsIndee Station road grade crossing 53.3 km, loaded Roy Hill train behind General Electric built ES44ACi model RHA 1007 serial 62579 and sister unit RHA 1010 with the mid-train units visible in the distance. GeoData. 15th June 2018.Jun 24, 2018
|
|

180615 1496207 viewsMooka Yard, side view of named BHP's Progress Rail built EMD SD70ACe unit 4486 'Jenny Parkinson' serial 20148001-019. 15th June 2018.
Roland Depth photo.Jun 24, 2018
|
|

180615 1497166 viewsMooka Yard, cab side of named BHP's Progress Rail built EMD SD70ACe unit 4486 'Jenny Parkinson' serial 20148001-019. 15th June 2018.
Roland Depth photo.Jun 24, 2018
|
|

180615 1411230 viewsBing Siding, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4432 'Warlu' serial 20128866-001 leads a loaded towards the port. 15th June 2018.Jun 24, 2018
|
|

180615 1472235 viewsBing South, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4455 serial 20138907-006 with 4356 second unit powers along the west mainline with a loaded rake heading for Finucane Island. 15th June 2018.Jun 24, 2018
|
|

180615 1407211 viewsBing Siding, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4432 'Warlu' serial 20128866-001 leads a loaded towards the port. 15th June 2018.Jun 24, 2018
|
|

180614 1342180 viewsGoldsworthy Junction, Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers, the straddle crane SD 1 is a new unit built by Vaia Car model no. TCR-V. GeoData. 14th June 2018.Jun 24, 2018
|
|

180614 1334186 viewsGoldsworthy Junction, Node 1 at the 17 km looking south west, new type LED tilt mast for signal GJ18. Steel train stabled at the junction. GeoData. 14th June 2018.Jun 24, 2018
|
|

180614 1333181 viewsGoldsworthy Junction, Node 1 at the 17 km looking south, new type LED tilt mast for signal GJ18. GeoData. 14th June 2018.Jun 24, 2018
|
|

180614 1332201 viewsAllen Siding, recycled rail from the Newman Mainline, a section of rail from the 222.8 km between Shaw and Hesta has made its way to the 45 km on the Goldsworthy line. GeoData. 14th June 2018.Jun 24, 2018
|
|

180614 1331200 viewsAllen Siding, the points and what remains of the point machine at the 45 km for the siding, looking east. GeoData. 14th June 2018.Jun 24, 2018
|
|

180614 1281203 viewsAllen Siding, at the 45 km looking west, the original rail or steel train is stowed on the mainline, looking from the rear lead off waggon 6203, built by Comeng WA in January 1977. The chute arrangement for the discharging and recovery of rail is visible. 14th June 2018. GeoData.Jun 24, 2018
|
|

180614 1329180 viewsAllen Siding, at the 45 km looking east, the original rail or steel train is stowed on the mainline, looking from 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible. 14th June 2018. GeoData.Jun 24, 2018
|
|

180527 1208203 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP stored redundant service waggons, the two heavy weight waggons, the original Vickers Hoskins built 6004 137.1 tonne capacity Ortner Freight Car Company design, and the much newer Gemco WA built 100 tonnes capacity waggon. 27th May 2018. GeoData.Jun 24, 2018
|
|

180527 1207190 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP has stored some redundant service waggons, flat waggon AQPY 2916 , the two heavy weight waggons, the old winch and crib waggons from the steel train and Difco side dumps. Looking west. 27th May 2018. GeoData.Jun 24, 2018
|
|

180527 1200654 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP has stored some redundant service waggons, Difco side dumps, a couple of heavy weights and the old winch and crib waggons from the steel train. Looking east with a former GML short Difco side dump waggon on the end. 27th May 2018. GeoData.Jun 24, 2018
|
|
3720 files on 186 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
60 |  |
 |
 |
 |
 |
 |
 |
|