Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Last additions - Pilbara negative and digital Albums - Iron Ore
170915_0721.jpg
170915 0721111 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1004 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
170915_0719.jpg
170915 0719106 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1012 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
170915_0720.jpg
170915 0720108 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1008 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
170915_0718.jpg
170915 0718116 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1011 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
170915_0717.jpg
170915 0717104 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1010 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
170915_0716.jpg
170915 0716116 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1002 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
170915_0715.jpg
170915 0715104 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1005 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
170915_0714.jpg
170915 0714111 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1007 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
170915_0713.jpg
170915 0713118 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1009 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
170915_0712.jpg
170915 0712122 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1006 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.Dec 06, 2017
170915_0710.jpg
170915 0710146 viewsGreat Northern Highway 18.2 km grade crossing, empty Roy Hill fuel train powers along bound for Tad Yard with General Electric built ES44ACi unit RHA 1019 serial 64300 leading eleven of Roy Hill's twelve tank waggons. 15th September 2017. View map here.Dec 06, 2017
040407_080602.jpg
040407 080602178 viewsSixteen inch split rim with the elongated stud holes following loose nuts and the wheel parting company with the car! 7th April 2004.Nov 26, 2017
040407_080551.jpg
040407 080551230 viewsTHE WHEEL NUUUTTSS!! Here we see Toy Titan in a spot of bother when the rear LHS wheel parted company at the 23 km Newman mainline. Was lucky to get out of it with so little damage! Wednesday 7th April 2004.Nov 26, 2017
040407_080434.jpg
040407 080434152 viewsToy Titan had the LHS rear wheel part company and went bush at the 23 km on the Newman mainline, this is the scour mark. Wednesday 7th April 2004.Nov 26, 2017
040407_080418.jpg
040407 080418165 viewsToy Titan on the lean when the LHS rear wheel parted company and went bush. 23 km Newman mainline. Wednesday 7th April 2004.Nov 26, 2017
040407_080354.jpg
040407 080354168 viewsToy Titan on the lean when the LHS rear wheel parted company and went bush. 23 km Newman mainline. Wednesday 7th April 2004.Nov 26, 2017
040407_080337.jpg
040407 080337262 viewsToy Titan on the lean when the LHS rear wheel parted company and went bush. 23 km Newman mainline. Wednesday 7th April 2004.Nov 26, 2017
040407_075425.jpg
040407 075425168 viewsMooka Siding, LED colour light signal head MAN 6 located at the north end of the passing siding, departure signal.Nov 26, 2017
040407_075405.jpg
040407 075405155 viewsMooka Siding, north end looking north, 31.4 km showing the standard layout of the track when it was single track with passing sidings, MAN 4 on the left is the mainline departure and MAN 6 in the passing track departure, all LED type. The DED 'dragging equipment detection' bars are visible along with the arrival signal and relay room. 7th April 2004.Nov 26, 2017
040407_075353.jpg
040407 075353152 viewsMooka Siding, looking south with the back track switch and road branching off the passing track, the mainline is on the right. 7th April 2004.Nov 26, 2017
3683 files on 185 page(s) 66

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional