Last additions - South Australia - Eyre Peninsula Negative and Digital Albums |

130708 0889285 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 20 E, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0888284 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 36 U, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0887283 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 54 S, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0886287 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0885306 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0884291 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0883287 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0882277 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0881294 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0880274 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0879282 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0878295 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0877274 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0876295 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0875302 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0874313 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0873288 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0872287 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0871306 viewsThevenard, view of arriving loaded train from inside the yard.Jan 27, 2015
|
|

130708 0870283 viewsThevenard, view of arriving loaded train from inside the yard.Jan 27, 2015
|
|
2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
27 |  |
 |
 |
 |
 |
 |
 |
|