Last additions - South Australia - Eyre Peninsula Negative and Digital Albums |

130708 0889264 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 20 E, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0888257 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 36 U, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0887257 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 54 S, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0886251 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0885263 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0884269 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0883263 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0882244 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0881258 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0880251 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0879250 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0878273 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0877250 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0876256 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0875273 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0874282 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0873256 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0872250 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0871278 viewsThevenard, view of arriving loaded train from inside the yard.Jan 27, 2015
|
|

130708 0870235 viewsThevenard, view of arriving loaded train from inside the yard.Jan 27, 2015
|
|
2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
27 |  |
 |
 |
 |
 |
 |
 |
|