Last additions - South Australia - Eyre Peninsula Negative and Digital Albums |

130708 0889405 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 20 E, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0888404 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 36 U, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0887398 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 54 S, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0886400 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0885415 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0884434 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0883397 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0882397 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0881401 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0880394 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0879403 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0878410 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 0877405 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0876400 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0875434 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0874463 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0873397 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0872398 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 0871427 viewsThevenard, view of arriving loaded train from inside the yard.Jan 27, 2015
|
|

130708 0870386 viewsThevenard, view of arriving loaded train from inside the yard.Jan 27, 2015
|
|
| 2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
27 |  |
 |
 |
 |
 |
 |
 |
|