Last additions - South Australia - Eyre Peninsula Negative and Digital Albums |

130708 088986 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 20 E, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 088884 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 36 U, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 088784 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 54 S, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 088677 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 088580 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 088482 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 088383 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 088272 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 088183 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 088083 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 087981 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 087882 viewsThevenard, loaded train running through the back of the yard and crossing Bergmann Drive grade crossing, 434.2 km.Jan 27, 2015
|
|

130708 087779 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 087696 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 087582 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 087485 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 087377 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 087271 viewsThevenard, loaded train running through the back of the yard parallel to Bergmann Drive, 434.2 km.Jan 27, 2015
|
|

130708 087184 viewsThevenard, view of arriving loaded train from inside the yard.Jan 27, 2015
|
|

130708 087081 viewsThevenard, view of arriving loaded train from inside the yard.Jan 27, 2015
|
|
2177 files on 109 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
27 |  |
 |
 |
 |
 |
 |
 |
|