Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums

Last additions - South Australia - Eyre Peninsula Negative and Digital Albums
130705_0608.jpg
130705 060865 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0607.jpg
130705 060765 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0605.jpg
130705 060561 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0606.jpg
130705 060668 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0603.jpg
130705 060364 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left is the concrete toilet block, Ascom silo complex (Block 5), the train is loading on the grain loop, loaded rake on the mainline, horizontal bunker (Block 4) and the crew barracks. 5th July 2013.Jan 27, 2015
130705_0604.jpg
130705 060466 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0601.jpg
130705 060170 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0602.jpg
130705 060263 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0600.jpg
130705 060060 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0599.jpg
130705 059951 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0597.jpg
130705 059763 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0598.jpg
130705 059861 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0595.jpg
130705 059569 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0596.jpg
130705 059666 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0593.jpg
130705 059365 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0594.jpg
130705 059468 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0592.jpg
130705 059271 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0591.jpg
130705 059168 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0590.jpg
130705 059065 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0589.jpg
130705 058970 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
2177 files on 109 page(s) 40

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional