Most viewed - 060113 |

060113 2430502 viewsThevenard, GCF type weighbridge test waggon GCF 7083, originally built by SAR Islington Workshops as an CFN type cattle waggon CFN 7083 in 1945 and sent new to EP Division, converted in 1969 to GCF sleeper transport waggon, then to a Shunters Runner c.1975 and to the current guise c.1996. More details can be found for this waggon here. Seen here next to one of the silo complexes.
|
|

060113 2421499 viewsCeduna, loaded gypsum train 6DD2 stirs up the dust behind the triple Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 08:10 AM on the Friday the 13th January 2006.
|
|

060113 2516497 viewsKevin, empty train 6DD3 shunts back onto the triangle leg behind triple NJ/1600 class units, as the 2nd driver is on the ground monitoring the train as it passes over the points. 13th January 2006.
|
|

060113 2427491 viewsCeduna, originally one of sixty two Kinki Sharyo built NH type for the NAR in 1966, now coded ENH type ENH 33 with hungry boards loaded with gypsum, on loaded train 6DD2 near the 436 km post.
|
|

060113 2417488 viewsCeduna, loaded gypsum train 6DD2 stirs up the dust behind the triple Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 08:10 AM on the Friday the 13th January 2006.
|
|

060113 2454486 viewsThevenard, AE Goodwin ALCo model DL531 built for the SAR as 830 class locomotive 871 serial G3422-1 was issued when built in 1966 to the Eyre Peninsula division of South Australian Railways. Still wearing Australian National green and yellow but with ASR decals as it stands in the yard with a couple of ENH type hopper waggons. 13th January 2006.
|
|

060113 2432485 viewsThevenard, at the Gypsum Resources Australian (GRA) gypsum unloading site, 1604 leads a triple consist of Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004. Friday 13th January 2006.
|
|

060113 2416476 viewsCeduna, loaded gypsum train 6DD2 powers along the grades outside of town behind the triple 1600 / NJ class combination of 1604, NJ 3 and 1601 at 08:10 AM on the Friday the 13th January 2006.
|
|

060113 2422474 viewsCeduna, loaded gypsum train 6DD2 stirs up the dust behind the triple Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 08:10 AM on the Friday the 13th January 2006.
|
|

060113 2451473 viewsThevenard, originally one of sixty two Kinki Sharyo built NH type waggons for the NAR in 1966 as NH 923, and recoded to ENH type ENH 23 in 1985, with hungry boards and access ladder intact. Exiting the Waratah Gypsum unloader and crossing Innes Avenue enroute into the yard. 13th January 2006.
|
|

060113 2460473 viewsThevenard, empty gypsum train 6DD3 roll through the yard as the outgoing crew conduct a roll by inspection. 13th January 2006.
|
|

060113 2415470 viewsCeduna, loaded gypsum train 6DD2 powers along the grades outside of town behind the triple 1600 / NJ class combination of 1604, NJ 3 and 1601 at 08:10 AM on the Friday the 13th January 2006.
|
|

060113 2419467 viewsCeduna, loaded gypsum train 6DD2 stirs up the dust behind the triple Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 08:10 AM on the Friday the 13th January 2006.
|
|

060113 2441467 viewsThevenard, at the Gypsum Resources Australian (GRA) gypsum unloading site, 1604 leads a triple consist of Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004. Friday 13th January 2006.
|
|

060113 2459464 viewsThevenard, yard view looking west from No. 13 points at the front of the maintenance 'yard' with the disused grain bunker and 6DD3 running along beside the silos as it unloads at GRA, further silos form the background with the maintenance centre with stand-by loco 871 on hand and a couple of ENH hopper waggons. 13th January 2006.
|
|

060113 2426462 viewsCeduna, loaded gypsum train 6DD2 behind the triple Clyde Engineering EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 08:10 AM on the Friday the 13th January 2006.
|
|

060113 2462457 viewsThevenard, narrow gauge loco 1604 with a fresh crew depart the yard with empty train 6DD3, 1604 leads a triple consist of Clyde Engineering built EMD JL22C model 1600 / NJ class combination of 1604 serial 71-731 and originally NJ 4, NJ 3 serial 71-730 and 1601 serial 71-728 the original class leader NJ 1, all three units started on the Central Australia Railway in 1971 and were transferred to the Eyre Peninsula in 1981. 1604 and 1601 both renumbered in 2004. A roll-by is also being conducted by an outgoing crew member. 13th January 2006.
|
|

060113 2534456 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.
|
|

060113 2500452 viewsKevin, empty train 6DD3 on the stub of the now closed line to Penong shunts back onto the triangle leg to reverse the train prior to loading. 13th January 2006.
|
|

060113 2553452 viewsKevin, standing on the mainline to Thevenard, and the train now identified as 6DD4 has commenced loading of gypsum but the 988 Cat front end loaders which takes about one and half hours to load. As the train reversed on the triangle the consist is the same heading back loaded with 1604 leading NJ 3 and 1601. 13th January 2006.
|
|
|
|