Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0227

Most viewed - 0227
227-09.jpg
227-0989 viewsNelson Point, a view from the rear of A berth at the salt pile and stacker, this was operated by Cargill at the time of the photo. The under harbour tunnel portal is on the right. GeoData.
227-17.jpg
227-1789 viewsNelson Point, from the rear of Shiploader 2 looking south with Shiploader 1 on the right on B berth, and the ore transporting infrastructure. GeoData.
227-28.jpg
227-2889 views30 km area, mid-train lead remote 5659 'Kobe' serial 8412-04/94-150 a Goninan CM40-8M GE rebuild. GeoData.
227-30.jpg
227-3089 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
227-33.jpg
227-3389 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
227-06.jpg
227-0688 viewsNelson Point, view along B berth with Shiploader 1, this loader has since been replaced. In the distance now are berths E and F, Redbank Powerstation can be seen in the distance. GeoData.
227-12.jpg
227-1288 viewsNelson Point, view from rear of Shiploader 2, salt pile, manganese stockpile in the distance, stacker 3, the Port Hedland water tower, then 101-102 sample station and Tertiary Crushing Building One or TCB1, stacker 4 and reclaimer 3 with the under harbour portal in the foreground. GeoData.
227-19.jpg
227-1987 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
227-24.jpg
227-2487 views30 km area, second unit on an empty ore train 5651 'Tobata' serial 8412-08 / 93-142 a Goninan CM40-8M GE rebuild. GeoData.
227-32.jpg
227-3287 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
227-25.jpg
227-2586 views30 km area, third unit on an empty ore train is class leader 6070 'Port Hedland' serial 51062 a General Electric AC6000 built by GE Erie. GeoData.
227-34.jpg
227-3485 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. Toyota tray back. GeoData.
227-21.jpg
227-2184 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
227-35.jpg
227-3583 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. Toyota tray back. GeoData.
227-23.jpg
227-2382 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind Goninan CM40-8M GE rebuilds 5649 'Pohang' serial 8412-07/93-140 and 5651 with third unit an General Electric AC6000. GeoData.
227-26.jpg
227-2680 views30 km looking south, empty ore train with mostly Comeng built ore waggons. GeoData.
227-22.jpg
227-2275 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind Goninan CM40-8M GE rebuilds 5649 'Pohang' serial 8412-07/93-140 and 5651 with third unit an General Electric AC6000. GeoData.
     
37 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional