Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0228

Most viewed - 0228
228-16.jpg
228-16195 viewsGrasshopper.
228-24.jpg
228-24195 viewsYandi Two branch, trailing shot of the afternoon empty train mid-train remotes heading west near the YT307 km in the form of elephant style Goninan final rebuild GE CM40-8MEFI model unit 5669 'Beilun' serial 8412-02/95-160 and CM40-8M model 5638 'Mallina' serial 8281-02/92-127. Geodata -22.706976, 119.097651 .
228-33.jpg
228-33193 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .
228-30.jpg
228-30192 viewsYandi Two load-out tunnel, trailing view of empty train about to enter for loading behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
228-28.jpg
228-28191 viewsYandi Two load-out tunnel, view of empty train about to enter for loading behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
228-34.jpg
228-34189 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .
228-27.jpg
228-27188 viewsYandi Two balloon loop, the afternoon empty train arrives at the load-out tunnel behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
228-23.jpg
228-23187 viewsYandi Two branch, the afternoon empty train mid-train remotes cross the bridge at the YT307 km in the form of elephant style Goninan final rebuild GE CM40-8MEFI model unit 5669 'Beilun' serial 8412-02/95-160 and CM40-8M model 5638 'Mallina' serial 8281-02/92-127. Geodata -22.706976, 119.097651 .
228-15.jpg
228-15185 viewsYandi Two mobile machine fuel point. A Caterpillar 16G road motor grader is receiving attention.
228-20.jpg
228-20185 viewsYandi Two branch, the afternoon empty train crosses the bridge at the YT307 km behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.706976, 119.097651 .
228-25.jpg
228-25182 viewsYandi Two balloon loop, the afternoon empty train arrives at the load-out tunnel behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
228-36.jpg
228-36182 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .
228-35.jpg
228-35181 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .
228-29.jpg
228-29178 viewsYandi Two load-out tunnel, view of empty train about to enter for loading behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
228-22.jpg
228-22177 viewsYandi Two branch, the afternoon empty train mid-train remotes cross the bridge at the YT307 km in the form of elephant style Goninan final rebuild GE CM40-8MEFI model unit 5669 'Beilun' serial 8412-02/95-160 and CM40-8M model 5638 'Mallina' serial 8281-02/92-127. Geodata -22.706976, 119.097651 .
228-21.jpg
228-21171 viewsYandi Two branch, trailing shot of the afternoon empty train heading west to the load-out behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.706976, 119.097651 .
228-32.jpg
228-32167 viewsYandi Two exit portal or loaded car side of load-out tunnel, stacker tip just visible above stock pile, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is active at a time. Geodata -22.719050, 119.040566 .
228-26.jpg
228-26164 viewsYandi Two balloon loop, the afternoon empty train arrives at the load-out tunnel behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
   
38 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional