233-35283 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4157, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.
|
|

233-15239 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-14230 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-16227 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-19226 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-30226 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5642 'Wallareenya' serial 8281-07 / 92-131 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. GeoData.
|
|

233-09224 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-07222 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-10222 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-18222 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-29222 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-05218 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
|
|

233-31218 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-12216 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-06215 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
|
|

233-13215 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-22214 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-08212 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-11212 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-20211 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|
|