233-3599 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4157, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.
|
|

233-1098 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-1597 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-0994 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-1694 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-1994 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-3693 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4161, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.
|
|

233-0892 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-0792 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-1492 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-1892 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-1791 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-0190 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. GeoData.
|
|

233-1290 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-1190 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-2390 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-0289 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
|
|

233-0588 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
|
|

233-1388 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-0386 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
|
|
|