Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0239

Most viewed - 0239
239-25.jpg
239-25290 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train LocoTrol equipped locomotive Goninan rebuild CM40-8ML cab-less unit, serial no. 8412-09/94-155 5664 'Kaohsiung' edging towards the load-out tunnel on the 17/01/1997. There was three of these units built without cab, they have all since had cabs fitted. GeoData.
239-24.jpg
239-24143 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train locomotive 5650 'Yawata', a Goninan rebuild GE CM40-8M model serial no. 8412-07/93-141 edging towards the load-out tunnel on the 17/01/1997. GeoData.
239-26.jpg
239-26136 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train locomotives 5650 'Yawata', a Goninan rebuild GE CM40-8M model serial no. 8412-07/93-141 with a LocoTrol equipped Goninan rebuild CM40-8ML cab-less unit, serial no. 8412-09/94-155 5664 'Kaohsiung' edging towards the load-out tunnel on the 17/01/1997. GeoData.
239-23.jpg
239-23108 viewsOverview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the radial stacker on the stockpile, power station radiators, new and old side tertiary crushing structures, sub-station 4, the workshops in the background and on the secondary crusher structure. The reclaim tunnels and conveyor CV3 are visible running from the bottom of the image to the secondary crusher. GeoData.
239-00.jpg
239-00105 viewsView inside the diesel power station located at Yandi One of a freshly overhauled Caterpillar 3516 engine and Kato alternator. Genset no. 1. GeoData.
239-27.jpg
239-27105 viewsYandi Two, conveyor belt CV202 failure of the primary crushing circuit conveyor. GeoData.
239-03.jpg
239-03101 viewsOverview of Yandi One mine from the end of the radial stacker boom looking south. GeoData.
239-37.jpg
239-3793 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
239-05.jpg
239-0592 viewsView from the radial stacker boom at Yandi One looking west, the rail loading balloon loop and dust extractor are visible at the bottom of the image and the mine waste dump is in the background. GeoData.
239-04.jpg
239-0490 viewsOverview looking south west from the radial stacker towards the Yandi One mine pit. GeoData.
239-15.jpg
239-1590 viewsLooking down from the middling crushers to the original 'old side' bank of five tertiary crushers. Sub-Station 2 can be seen at right with the control room above that. GeoData.
239-11.jpg
239-1189 viewsOverview of Yandi One looking towards the stockpile along CV11 towards CV20 and the radial stacker and CV21 the boom conveyor and full stockpile indicating the impending arrival of a train. The steel laydown is visible on the right. GeoData.
239-01.jpg
239-0188 viewsView inside the diesel power station located at Yandi One of a freshly overhauled Caterpillar 3516 engine and Kato alternator. Genset no. 1. Shows the air operated skate system to manoeuvre the unit into position. GeoData.
239-08.jpg
239-0888 viewsOverview of Yandi One mine from the end of the radial stacker boom looking south. GeoData.
239-09.jpg
239-0987 viewsOverview of Yandi One mine from the end of the radial stacker boom looking south. Buildings visible from the left, diesel fuel farm, sample hut, workshops beyond the power station and the offices in the background. GeoData.
239-06.jpg
239-0686 viewsView from the radial stacker at Yandi One looking north at the Yandi Repeater for the rail communication system. GeoData.
239-07.jpg
239-0785 viewsView from the Yandi One radial stacker looking north east, the camp for the mine is located a couple of kilometres beyond those front hills. The head drum of the conveyor and the ore stockpile are visible in the corner. GeoData.
239-19.jpg
239-1985 viewsView of the Yandi One primary crusher or 'mouth of the OHP' from the south side. The Jaques grizzly screen GS01 and Jaques single toggle jaw crusher are visible along with the Transmin rock breaker for when the ROM is oversize. The cab has bars on the window to prevent 'fly-rock' from smashing it. The job of the operator is a lonely one with only the momentum on the swing jaw or the occasional sparky visit to break the monotony. GeoData.
239-10.jpg
239-1084 viewsOverview of Yandi One mine from the end of the radial stacker boom, CV21, looking south along CV20 towards the OHP. Buildings visible from the left, diesel fuel farm, sample hut, workshops beyond the power station and the offices in the background. GeoData.
239-02.jpg
239-0283 viewsView inside the diesel power station located at Yandi One of a freshly overhauled Caterpillar 3516 engine and Kato alternator. Genset no 1. GeoData.
38 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional