Most viewed - BHP_Track_Machines |

050518 2212499 viewsBing Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the passing track. 18th May 2005.
|
|

060501 3925499 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, generating set and second driving cab module, cab side view. May 1, 2006.
|
|

060710 6232499 viewsAt the Broome Rd grade crossing Port Hedland, track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 10th July 2006.
|
|

050414 0946498 viewsFlash Butt yard, Speno Australia's RR24 model 24 stone rail grinder serial M20 before it had id stickers fitted, this unit was later stickered as RG 1, view of the generator and driving module. 14th April 2005.
|
|

060811 8012498 viewsGarden Siding, Speno rail grinder RG 2 coupled with RG 1 in the passing track. 11th August 2006.
|
|

050412 0809497 viewsAbydos Siding backtrack, builders plate of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050412 0814497 viewsAbydos Siding backtrack, view of the rear of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

051001 5667497 viewsFlash Butt yard, a newly delivered Knox Kershaw KBR 875 ballast regulator serial 015-875-05. October 1, 2005.
|
|

050411 0600496 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 comes off the former Goldsworthy line with the Newman mainline in the foreground. 11th April 2005.
|
|

050421 1314496 viewsShaw Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the mainline track. 21st April 2005.
|
|

050409 0404495 viewsShell Swagman Roadhouse, rear view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

050410 0510495 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050421 1623495 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the front unit was later stickered as RG 2, the rear unit was stickered as RG 1 and is serial M20. 21st April 2005.
|
|

050801 4773495 viewsIn the Flash Butt yard a line up of Barclay Mowlem track machines from the closest to the camera, tamper, regulator, regulator, tamper, clip installer, tamper then BHP's mainline tamper. 1st August 2005.
|
|

051001 5680495 viewsFlash Butt yard, lube chart of a newly delivered Knox Kershaw KBR 875 ballast regulator serial 015-875-05. October 1, 2005.
|
|

060501 3910494 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. May 1, 2006.
|
|

050410 0516493 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050411 0597493 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 comes off the former Goldsworthy line at signal GJ 9 which has two heads due to the curve of the line. 11th April 2005.
|
|

060501 3915493 viewsAbydos Siding backtrack, Speno rail grinder RG 2, third grinding module and driving cab. May 1, 2006.
|
|

050410 0518492 viewsNelson Point yard hard stand area front view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|
| 325 files on 17 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
11 |  |
 |
 |
 |
 |
|