Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Track_Machines

Most viewed - BHP_Track_Machines
050518_2210.jpg
050518 2210110 viewsBing Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the passing track. 18th May 2005.
050625_3610.jpg
050625 3610110 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480, over exposed shot to highlight the front of the unit in shadow. 25th June 2005.
050409_0404.jpg
050409 0404109 viewsShell Swagman Roadhouse, rear view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
050409_0412.jpg
050409 0412109 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 view of tamper frame and mechanism. 9th April 2005.
050421_1623.jpg
050421 1623109 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the front unit was later stickered as RG 2, the rear unit was stickered as RG 1 and is serial M20. 21st April 2005.
050421_1625.jpg
050421 1625109 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the front unit was later stickered as RG 2, the rear unit was stickered as RG 1 and is serial M20. 21st April 2005.
050801_4720.jpg
050801 4720109 viewsNelson Point yard, ballast plough waggon 538, modified by the Mt Newman workshops from an Magor USA built Oroville Dam ore waggon and originally coded ODCX 82160 which is still visible. 1st August 2005.
050409_0405.jpg
050409 0405108 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 side view of cab rear. 9th April 2005.
050409_0407.jpg
050409 0407108 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 side view tamper mechanism and frame bogie. 9th April 2005.
050409_0408.jpg
050409 0408108 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 view of tamper frame and mechanism. 9th April 2005.
050410_0503.jpg
050410 0503108 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
050414_0947.jpg
050414 0947108 viewsFlash Butt yard, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this front unit was later stickered as RG 2. 14th April 2005.
050421_1314.jpg
050421 1314108 viewsShaw Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the mainline track. 21st April 2005.
060501_3904.jpg
060501 3904108 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
050410_0517.jpg
050410 0517107 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
050411_0611.jpg
050411 0611107 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 runs along the Newman mainline towards Bing Siding. 11th April 2005.
050412_0812.jpg
050412 0812107 viewsAbydos Siding backtrack, view of the rear of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
050414_0941.jpg
050414 0941107 viewsFlash Butt yard, BHP clip driving machine, modified from a former Plasser Australia USP 3000 ballast regulator. 14th April 2005.
050414_0946.jpg
050414 0946107 viewsFlash Butt yard, Speno Australia's RR24 model 24 stone rail grinder serial M20 before it had id stickers fitted, this unit was later stickered as RG 1, view of the generator and driving module. 14th April 2005.
050414_0948.jpg
050414 0948107 viewsFlash Butt yard, Speno Australia's RR24 model 24 stone rail grinder serial M20 before it had id stickers fitted, this unit was later stickered as RG 1, rear view of the generator and driving module. 14th April 2005.
325 files on 17 page(s) 9

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional