Most viewed - BHP_Track_Machines |

060710 6228440 viewsAt the Broome Rd grade crossing Port Hedland, Switch Tamper SW 02 a Plasser Australia model Unimat S4 switch tamper. 10th July 2006.
|
|

060811 8012440 viewsGarden Siding, Speno rail grinder RG 2 coupled with RG 1 in the passing track. 11th August 2006.
|
|

050414 0937439 viewsFlash Butt yard, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper serial 153172. 14th April 2005.
|
|

050625 3665439 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
|
|

050625 3811439 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
|
|

060501 3929439 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
|
|

050412 0820438 viewsAbydos Siding backtrack, front view of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050801 4726438 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc. 1st August 2005.
|
|

050917 5506438 viewsCoon Siding, on the truncated passing siding following a derailment Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
|
|

060501 3916438 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20. 1st May 2006.
|
|

050801 4720437 viewsNelson Point yard, ballast plough waggon 538, modified by the Mt Newman workshops from an Magor USA built Oroville Dam ore waggon and originally coded ODCX 82160 which is still visible. 1st August 2005.
|
|

050917 5516437 viewsCoon Siding, view of the tamper driving and operators cabin locations on Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
|
|

060501 3911437 viewsAbydos Siding backtrack, Speno rail grinder RG 2, first and second grinding modules. 1st May 2006.
|
|

050407 0382436 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

050410 0516436 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050410 0517436 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050801 4719436 viewsNelson Point yard, ballast regulator BR 33 a Plasser Australia model SSP 302 unit serial M486. 1st August 2005.
|
|

050801 4748436 viewsFlash Butt yard, builders plate of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 1st August 2005.
|
|

050410 0510435 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050411 0599435 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 comes off the former Goldsworthy line at signal GJ 9 with the Newman mainline in the foreground. 11th April 2005.
|
|
| 325 files on 17 page(s) |
 |
 |
 |
 |
 |
 |
 |
9 |  |
 |
 |
 |
 |
 |
 |
|