Most viewed - BHP_Track_Machines |

050625 3602185 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
|
|

050625 3656185 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480 in out on the passing track. 25th June 2005.
|
|

060403 3272185 viewsTabba North, Barclay Mowlem high-rail Pettibone model 445-E Speed Swing, with the moniker Skinny's Bone. 3rd April 2006.
|
|

060501 3904185 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
|
|

060501 3912185 viewsAbydos Siding backtrack, Speno rail grinder RG 2, first grinding module. 1st May 2006.
|
|

060710 6240185 viewsAt the Broome Rd grade crossing Port Hedland, track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 10th July 2006.
|
|

060811 8014185 viewsGarden Siding, Speno rail grinder RG 1 an RR24 model grinder serial M20 coupled with RG 2 in the passing track. 11th August 2006.
|
|

050409 0404184 viewsShell Swagman Roadhouse, rear view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

050410 0512184 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050412 0812184 viewsAbydos Siding backtrack, view of the rear of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050421 1615184 viewsHesta Siding backtrack, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this unit was later stickered as RG 2, side view of the second grinding module. 21st April 2005.
|
|

050518 2211184 viewsBing Siding, BHP's Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper runs along the passing track. 18th May 2005.
|
|

050625 3610184 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480, over exposed shot to highlight the front of the unit in shadow. 25th June 2005.
|
|

050801 4728184 viewsFlash Butt yard, Barclay Mowlem tamping machine TM 8644 a Tamper HSTR 130 model serial 3581011. 1st August 2005.
|
|

050801 4754184 viewsFlash Butt yard, lube chart of a Knox Kershaw KBR 850 ballast regulator. 1st August 2005.
|
|

060501 3930184 viewsAbydos Siding backtrack, Speno rail grinder RG 2 coupled to RG 1. 1st May 2006.
|
|

060710 6227184 viewsAt the Broome Rd grade crossing Port Hedland, Switch Tamper SW 02 a Plasser Australia model Unimat S4 switch tamper. 10th July 2006.
|
|

050409 0405183 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 side view of cab rear. 9th April 2005.
|
|

050410 0517183 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050411 0611183 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 runs along the Newman mainline towards Bing Siding. 11th April 2005.
|
|
325 files on 17 page(s) |
 |
 |
 |
 |
 |
 |
 |
9 |  |
 |
 |
 |
 |
 |
 |
|