Most viewed - Rio_Tinto_Rolling_Stock |

060723 7685262 viewsOriginal Hamersley Iron compressor waggon set IC-6 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. Seen here on the causeway just outside 7 Mile. 23rd July 2006.
|
|

210322 9574262 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 121 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

210510 1133262 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 020 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

170728 09689261 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

170729 0108261 viewsRio Tinto compressor waggon set CB 14, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 29th July 2017.
|
|

060723 7834260 viewsRio Tinto compressor waggon set CB 02, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here inside 7 Mile. 23rd July 2006.
|
|

170728 09688258 viewsRio Tinto compressor waggon set CB 12, receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

210510 1134257 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 019 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

170510 8283256 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

110602 8646255 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco. Note these waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
|
|

170728 09687255 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

171018 0735251 viewsRio Tinto compressor waggon set CB 15, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 18th October 2017.
|
|

170728 09690250 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

210510 1132250 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 021 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

141124 7078249 viewsRio Tinto compressor waggon set leader CB 01, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here at Parker Point, Dampier on 24th November 2014.
|
|

110602 8647248 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
|
|

170510 8293245 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

210322 9583245 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

210322 9584245 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake, view of B end. Location is roughly here. 22nd March 2021.
|
|

210510 1140245 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 013 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
|