Most viewed - 01-06_2018 |

180615 1496299 viewsMooka Yard, side view of named BHP's Progress Rail built EMD SD70ACe unit 4486 'Jenny Parkinson' serial 20148001-019. 15th June 2018.
Roland Depth photo.
|
|

180614 1331292 viewsAllen Siding, the points and what remains of the point machine at the 45 km for the siding, looking east. GeoData. 14th June 2018.
|
|

180614 1281291 viewsAllen Siding, at the 45 km looking west, the original rail or steel train is stowed on the mainline, looking from the rear lead off waggon 6203, built by Comeng WA in January 1977. The chute arrangement for the discharging and recovery of rail is visible. 14th June 2018. GeoData.
|
|

180527 1208289 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP stored redundant service waggons, the two heavy weight waggons, the original Vickers Hoskins built 6004 137.1 tonne capacity Ortner Freight Car Company design, and the much newer Gemco WA built 100 tonnes capacity waggon. 27th May 2018. GeoData.
|
|

180614 1332288 viewsAllen Siding, recycled rail from the Newman Mainline, a section of rail from the 222.8 km between Shaw and Hesta has made its way to the 45 km on the Goldsworthy line. GeoData. 14th June 2018.
|
|

180616 1662286 viewsCooya Pooya, instrumented ore waggon 1024, a Bradken built 'J' waggon with a build date from January 2006. The solar panels are mounted along each side. 16th June, 2018.
|
|

180614 1334279 viewsGoldsworthy Junction, Node 1 at the 17 km looking south west, new type LED tilt mast for signal GJ18. Steel train stabled at the junction. GeoData. 14th June 2018.
|
|

180614 1333276 viewsGoldsworthy Junction, Node 1 at the 17 km looking south, new type LED tilt mast for signal GJ18. GeoData. 14th June 2018.
|
|

180527 1207275 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP has stored some redundant service waggons, flat waggon AQPY 2916 , the two heavy weight waggons, the old winch and crib waggons from the steel train and Difco side dumps. Looking west. 27th May 2018. GeoData.
|
|

180616 1657274 viewsCooya Pooya, 32 km on the Cape Lambert line, Rio Tinto loco 9103 with serial 61941 a GE Erie built GE model ES44ACi from the 1st order in Rio Tinto Stripes livery is 'tied down' to the mainline following a total loss of air, the locomotive's hose bag can be seen chained to the rail in case of movement. The train pulled a coupling around the 45 car position. 16th June 2018. Geodata
|
|

180616 1628273 viewsHarding Siding, a loaded train from Mesa A behind double Rio Tinto loco 9103 with serial 61941 a GE Erie built GE model ES44ACi from the 1st order in Rio Tinto Stripes livery and 9108 serial 62539 with 167 'J' type ore waggons around the curve at the 38.5 km. 16th June 2018. GeoData
Toad Montgomery image.
|
|

180616 1659271 viewsCooya Pooya, 32 km on the Cape Lambert line, Rio Tinto loco 9103 with serial 61941 a GE Erie built GE model ES44ACi from the 1st order in Rio Tinto Stripes livery side view, following a total loss of air, the locomotive's hose bag is chained to the rail in case of movement. The train pulled a coupling around the 45 car position. 16th June 2018. Geodata
|
|

180616 1679270 viewsCooya Pooya, instrumented ore waggon 1031, part of a second batch of extra 'J' waggons built by Bradken in September 2008 and painted rather than the plain steel finish. Solar panels adorn the waggon sides. 16th June 2018. GeoData.
|
|

180614 1329269 viewsAllen Siding, at the 45 km looking east, the original rail or steel train is stowed on the mainline, looking from 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible. 14th June 2018. GeoData.
|
|

180614 1342266 viewsGoldsworthy Junction, Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers, the straddle crane SD 1 is a new unit built by Vaia Car model no. TCR-V. GeoData. 14th June 2018.
|
|

180616 1664250 viewsCooya Pooya, 32 km on the Cape Lambert line, Rio Tinto loco 9103 with serial 61941 a GE Erie built GE model ES44ACi from the 1st order in Rio Tinto Stripes livery and 9108 serial 62539 are tied down on the West Mainline following a total loss of air. The train pulled a coupling around the 45 car position. 16th June 2018. Geodata
|
|

180615 1497246 viewsMooka Yard, cab side of named BHP's Progress Rail built EMD SD70ACe unit 4486 'Jenny Parkinson' serial 20148001-019. 15th June 2018.
Roland Depth photo.
|
|

180615 1625245 viewsGoldsworthy Junction, BHP stabled rail or steel train holds the former Goldsworthy mainline between the junction and Node 1 due to upgrading track works within the flash butt yard behind Electro-Motive Diesel built SD70ACe 4360 serial 20098203-005 in late afternoon light. 15th June 2018. GeoData.
Photo by Roland Depth.
|
|

180616 1771240 viewsAt the 81 km on the Tom Price West mainline, Rio Tinto loco 7056 with serial 55881 a GE Erie built GE model Dash 9-44CW from the 8th order in HI Pilbara Iron livery leads sister 7047 and ES44DCi unit 8115 in Rio Tinto silver with a loaded train of B and Q series waggons operating in AutoHaul™ as they approach Emu and then continue onto Dampier. 16th June, 2018. GeoData.
|
|

180616 1678239 viewsCooya Pooya, located just south of the 32 km post, a loaded Mesa A train waggon 817, a Centurion Industries WA build, has managed to pull the coupler completely out of waggon 425 a Tomlinson Steel WA built waggon. 16th June 2018. GeoData.
Photo by Roland Depth.
|
|
|