Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Robe_River_Rolling_Stock

Most viewed - Robe_River_Rolling_Stock
IC20_070908_0594.jpg
IC20 070908 0594278 viewsRobe River compressor waggon sets IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors and IC 22 with receiver and IC 23 with compressors These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
IC22_070908_0595.jpg
IC22 070908 0595271 viewsRobe River compressor waggon set IC 22 with air receiver and IC 23 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
9006_070909_0655.jpg
9006 070909 0655243 viewsRobe River compressor waggon 9006 on the lead of a Deepdale rake going through the car dumper at Cape Lambert. Fitted with an Atlas Copco XAS 85 compressor, fuel tank and air receiver. This waggon is a modified Tomlinson Steel built ore waggon. 9th August 2007.
IC20_070908_0596.jpg
IC20 070908 0596232 viewsRobe River compressor waggon set IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
0672_060716_7191.jpg
0672 060716 71918 viewsRobe River ore waggon 672, built by Tomlinson Steel WA, fixed coupler end handbrake side loaded. July 16, 2006.
0031_060716_7190.jpg
0031 060716 71907 viewsRobe River ore waggon 938, built by Centurion Industries WA, fixed coupler end handbrake side loaded. Western Creek, July 16, 2006.
0677_060716_7185.jpg
0677 060716 71857 viewsRobe River ore waggon 677, built by Tomlinson Steel WA, fixed coupler end handbrake side loaded. Western Creek, July 16, 2006.
0804_060716_7191.jpg
0804 060716 71917 viewsRobe River ore waggon 804, built by Centurion Industries WA, fixed coupler end handbrake side loaded. Western Creek, July 16, 2006.
0884_060716_7199.jpg
0884 060716 71997 viewsRobe River ore waggon 884, built by Centurion Industries WA, fixed coupler end handbrake side loaded. Western Creek, July 16, 2006.
6001_041014_154950.jpg
6001 041014 1549506 viewsRobe River ballast waggon 6001, built by Tomlinson Steel WA, Cape Lambert yard. 1549 hours, October 14, 2004.
6002_041014_154944.jpg
6002 041014 1549446 viewsRobe River ballast waggon 6002, built by Tomlinson Steel WA, Cape Lambert yard. 1549 hours, October 14, 2004.
0455_060716_7188.jpg
0455 060716 71886 viewsRobe River ore waggon 455, built by Tomlinson Steel WA, fixed coupler end handbrake side loaded. Western Creek, July 16, 2006.
0520_060716_7187.jpg
0520 060716 71876 viewsRobe River ore waggon 520, built by Tomlinson Steel WA, fixed coupler end handbrake side loaded. Western Creek, July 16, 2006.
0565_060716_7188.jpg
0565 060716 71885 viewsRobe River ore waggon 565, built by Tomlinson Steel WA, fixed coupler end handbrake side loaded. Western Creek, July 16, 2006.
0784_060716_7197.jpg
0784 060716 71975 viewsRobe River ore waggon 784, built by Centurion Industries WA, fixed coupler end handbrake side loaded. Western Creek, July 16, 2006.
0897_060716_7187.jpg
0897 060716 71875 viewsRobe River ore waggon 897, built by Centurion Industries WA, fixed coupler end handbrake side loaded. Western Creek, July 16, 2006.
0958_060716_7192.jpg
0958 060716 71925 viewsRobe River ore waggon 958, built by Centurion Industries WA, fixed coupler end handbrake side loaded. Western Creek, July 16, 2006.
8002_060716_7200.jpg
8002 060716 72005 viewsWestern Creek, Robe River diesel fuel tank waggon 8002 running empty on a loaded ore train, built by Comeng NSW in September 1972 with a 45,000 litre capacity. 1401 hours, July 16, 2006.
0538_050108_143236.jpg
0538 050108 1432364 viewsRobe River ore waggon 538, built by Tomlinson Steel WA, rotary coupler end handbrake side loaded at the 8 km with the turning wye south track in the foreground. 1432 hours, October 8, 2005.
6001_041014_154934.jpg
6001 041014 1549344 viewsRobe River ballast waggons, they had three built by Tomlinson Steel WA and numbered 6001 to 6003 as seen here in Cape Lambert yard. 1549 hours, October 14, 2004.
40 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional