Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Roy_Hill_Rolling_Stock

Most viewed - Roy_Hill_Rolling_Stock
250501_0303.jpg
250501 03031 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2539 - GA 2540, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0423.jpg
250501 04231 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2401 - GA 2402, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0425.jpg
250501 04251 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3565 - GA 3566, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0490.jpg
250501 04901 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2655 - GA 2656, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0492.jpg
250501 04921 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2095 - GA 2096, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0554.jpg
250501 05541 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2931 - GA 2932, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0555.jpg
250501 05551 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2431 - GA 2432, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
150412_7915.jpg
150412 79151 viewsRoy Hill's Rail Construction Yard, at the 21.2 km, near Boodarie, 120 new CSR Yangtze built CCK138 stainless steel waggons wait to be placed on the rails. April 12, 2015.
8 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional