Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Roy_Hill_Rolling_Stock

Most viewed - Roy_Hill_Rolling_Stock
250501_0389.jpg
250501 0389152 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2905 - GA 2096, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0531.jpg
250501 0531152 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3433 - GA 3434, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
250501_0418.jpg
250501 0418151 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2745 - GA 2746, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0551.jpg
250501 0551151 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2045 - GA 2046, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0415.jpg
250501 0415150 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3613 - GA 3614, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0471.jpg
250501 0471150 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3453 - GA 3454, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0316.jpg
250501 0316149 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2775 - GA 2776, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0378.jpg
250501 0378149 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3017 - GA 3018, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0380.jpg
250501 0380149 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2261 - GA 2262, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0387.jpg
250501 0387148 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3403 - GA 3404, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0409.jpg
250501 0409148 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2057 - GA 2058, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
150314_7770.jpg
150314 7770148 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2144 end view showing the F type coupler and lever, only the even numbered waggons, or control waggon, has an uncoupling lever, the odd numbered, or slave waggons do not. March 14. 2015.
250501_0328.jpg
250501 0328147 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3309 - GA 3310, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0554.jpg
250501 0554147 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2931 - GA 2932, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0555.jpg
250501 0555147 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2431 - GA 2432, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0326.jpg
250501 0326146 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3281 - GA 3282, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0382.jpg
250501 0382146 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3161 - GA 3162, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0401.jpg
250501 0401146 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3001 - GA 3002, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0526.jpg
250501 0526146 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2885 - GA 2886, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0545.jpg
250501 0545146 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3369 - GA 3370, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
256 files on 13 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional