Most viewed - Roy_Hill_Rolling_Stock |

250501 032580 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2983 - GA 2984, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 055580 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2431 - GA 2432, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 031779 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2759 - GA 2760, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 038979 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2905 - GA 2096, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 040079 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2735 - GA 2736, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 050879 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2239 - GA 2240, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

150314 776279 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2231 side view showing the logo and details, the yellow circle designates the rotary coupler end. March 14. 2015.
|
|

250501 031378 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2505 - GA 2506, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 038278 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3161 - GA 3162, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 053178 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3433 - GA 3434, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
|
|

250501 055178 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2045 - GA 2046, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 055378 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2817 - GA 2818, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

150314 776478 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2231 end view showing where the bar coupling will go and the pipe and electrical connection for the married pair. March 14. 2015.
|
|

150314 776778 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2077 end view showing fixed end, only the even numbered waggons, or control waggon, has an uncoupling lever, the odd numbered, or slave waggons do not. March 14. 2015.
|
|

250501 032277 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2935 - GA 2936, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 038777 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3403 - GA 3404, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 039477 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2093 - GA 2094, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 039777 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3013 - GA 3014, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 040377 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2351 - GA 2352, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 055477 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2931 - GA 2932, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|
256 files on 13 page(s) |
 |
3 |  |
 |
 |
 |
 |
 |
 |
 |
 |
|