Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > Roy_Hill_Rolling_Stock

Most viewed - Roy_Hill_Rolling_Stock
150314_7789.jpg
150314 778966 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2144 end view showing the F type coupler, hose and electrical connection and uncoupling lever, only the even numbered waggons, or control waggon, has an uncoupling lever, the odd numbered, or slave waggons do not. March 14. 2015.
250501_0337.jpg
250501 033765 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3051 - GA 3052, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0339.jpg
250501 033965 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2791 - GA 2792, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0344.jpg
250501 034465 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3383 - GA 3384, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0372.jpg
250501 037265 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2155 - GA 2156, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0395.jpg
250501 039565 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3247 - GA 3248, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0416.jpg
250501 041665 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3573 - GA 3574, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0438.jpg
250501 043865 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2741 - GA 2742, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0448.jpg
250501 044865 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2197 - GA 2798, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0482.jpg
250501 048265 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3349 - GA 3350, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0497.jpg
250501 049765 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2205 - GA 2206, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0513.jpg
250501 051365 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3631 - GA 3632, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
250501_0517.jpg
250501 051765 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3449 - GA 3450, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
250501_0349.jpg
250501 034964 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2065 - GA 2066, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0354.jpg
250501 035464 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3153 - GA 3154, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0420.jpg
250501 042064 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2607 - GA 2608, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0434.jpg
250501 043464 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3601 - GA 3602, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0463.jpg
250501 046364 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3537 - GA 3538, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0492.jpg
250501 049264 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2095 - GA 2096, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0506.jpg
250501 050664 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3115 - GA 3116, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
256 files on 13 page(s) 9

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional