Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Ore 2001-3000

Most viewed - BHP_Rolling_Stock_-_Ore 2001-3000
2063_Goninan_040815_165436.jpg
2063 Goninan 040815 1654361287 viewsNelson Point Car Dumper 3, a Goninan built replacement ore waggon, numbered 2063, one of a batch of 345 waggons built to the new Lynx Engineering design known as the Golynx waggons with 3CR12 stainless steel in a bid to eliminate painting to reduce wear on the waggon body. Serial 950088-190, build date 04/2001. 15th August 2004.
2063_Goninan_040815_165508.jpg
2063 Goninan 040815 1655081081 viewsNelson Point Car Dumper 3, builders plate of Goninan built replacement ore waggon 2063, one of a batch of 345 waggons built to the new Lynx Engineering design known as the Golynx waggons serial 950088-190 and build date 04/2001. 15th August 2004.
2257_Comeng_040412_144448.jpg
2257 Comeng 040412 144448635 viewsNelson Point, Comeng WA built ore waggon 2257 one of 183 waggons built in 1970. 12th April 2004.
2940_Goninan_040412_143710.jpg
2940 Goninan 040412 143710629 viewsNelson Point, Goninan built, Lynx Engineering designed ore waggon 2940 are known as Golynx waggons, one of 345 such waggons constructed during 2001 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. 12th April 2004.
2257_Comeng_040412_144500.jpg
2257 Comeng 040412 144500595 viewsNelson Point, Comeng WA built ore waggon 2257 one of 183 waggons built in 1970, view of handbrake end. 12th April 2004.
110620_2392r.jpg
2925 Comeng 110620 2392529 viewsWalla, comparison between loaded BHP ore waggons from Comeng WA in 2925 and 3312 from Astra Vagoane, Arad Romania. 2925 is from a batch of four hundred built in 1971 by Comeng WA, while 3312 is from a batch of three hundred and fifty built in 1988 by Astra Vagoane, of which two hundred and eighty-four didn't enter service. The Comeng build features square side and floor joins, while the Astra Vagoane build is all rounded. June 20, 2011.
110620_2040r.jpg
2899 Comeng 110620 2040497 viewsWalla Siding, empty BHP ore waggon 2899, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The steel panels in the ribs have been resheeted, but not the end panels. June 20, 2011.
110620_2456r.jpg
2683 Comeng 110620 2456455 viewsWalla, loaded BHP ore waggon 2683, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The walls in the ribs have been resheeted. Still has the original white end for rotary coupler, original number and weight. June 20, 2011.
2063_Goninan_040815_165508.jpg
2063 Goninan 040815 165508148 viewsBHP Iron Ore waggon 2063 builders plate, a Goninan WA build in a batch of 345 and the first Golynx builds, serial number 950088-190 built in April 2001. August 15, 2004.
2530_UGL_110414_0118.jpg
2530 UGL 110414 0118144 viewsBoodarie, empty BHP Iron Ore waggon 2530, a Golynx build replacement body by United Goninan Limited WA, new build from February 2011. Original Comeng build undergear. The 5Cr12Ti decal is the type of steel the body is made of. April 14, 2011.
2584_UG_110414_0123.jpg
2584 UG 110414 0123135 viewsBoodarie, empty BHP Iron Ore waggon 2584, a Golynx build replacement body by United Goninan, new build from May 2010. Original Comeng build undergear. April 14, 2011.
2429_Comeng_040815_170334.jpg
2429 Comeng 040815 170334131 viewsNelson Point, Car Dumper 1, loaded BHP Iron Ore waggon 2429, a Comeng WA build from the third batch built in 1970. August 15, 2004.
2885_Comeng_WA_110414_0112.jpg
2885 Comeng 110414 0112127 viewsBoodarie, loaded BHP Iron Ore waggon 2885, a Comeng WA original build from 1971 that is still pretty original. April 14, 2011.
2108_UGL_110414_0146.jpg
2108 UGL 110414 0146114 viewsBoodarie, empty BHP Iron Ore waggon 2108, a Golynx build replacement body by United Goninan Limited WA, new build from February 2011. Original Comeng build undergear. The 5Cr12Ti decal is the type of steel the body is made of. April 14, 2011.
2513_Comeng_040815_170104.jpg
2513 Comeng 040815 170104113 viewsNelson Point, Car Dumper 3, loaded BHP Iron Ore waggon 2513, a Comeng WA build from the third batch built in 1970. August 15, 2004.
2682_UGR_110414_0115.jpg
2682 UGR 110414 0115109 viewsBoodarie, loaded BHP ore waggon 2682, a UG Rail built replacement Golynx body style for a scrapped Comeng builds. April 14, 2011.
2314_Comeng_040718_151533.jpg
2314 Comeng 040718 151533108 viewsNelson Point, Car Dumper 1, loaded BHP Iron Ore waggon 2314, an original Comeng build from the second batch in 1970, looks to still be pretty original apart from the scalloped ends filled in. July 18, 2004.
2063_Goninan_040815_165452.jpg
2063 Goninan 040815 165452106 viewsNelson Point, Car Dumper 3, empty BHP Iron Ore waggon 2063, a Goninan WA build in a batch of 345 and the first Golynx builds, serial number 950088-190 built in April 2001. August 15, 2004.
2355_UG_110414_0111.jpg
2355 UG 110414 0111105 viewsBoodarie, loaded BHP Iron Ore Waggon 2355, a United Goninan WA replacement body built May 2009. Has original Comeng build 2410s undergear. April 14, 2011.
2800_Comeng_041001_165104.jpg
2800 Comeng 041001 165104105 viewsRedbank, loaded BHP Iron Ore waggon 2800, a Comeng WA original build from the fifth order in 1971, the Yandi loadout must has had a glitch hence the odd loading profile. October 1, 2004.
33 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional