Most viewed - Pilbara negative and digital Albums - Iron Ore |

051001 5719378 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #26, 6015, builders plate, a Comeng WA built flat waggon from 1971.
|
|

050522 2739378 viewsGoldsworthy Junction, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich Qld in September 1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

060429 3743378 viewsFlash Butt yard, Pony waggon 9001, originally built by Scotts of Ipswich Qld as a box car or covered van in December 1971, heavily modified and converted for Pony traffic.
|
|

060501 3873378 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8703 side dump waggon loaded with ballast.
|
|

050410 0526378 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050412 0812378 viewsAbydos Siding backtrack, view of the rear of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

060501 3911378 viewsAbydos Siding backtrack, Speno rail grinder RG 2, first and second grinding modules. 1st May 2006.
|
|

110411 10013378 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
|
|

170729 0288378 viewsMaitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 have crossed the 96.2 km grade crossing. 29th July 2017. GeoData.
|
|

170730 0435378 viewsBoodarie, a loaded FMG iron ore train rounds the large curve at the 5 km as it approaches the car dumper balloon loops behind Progress Rail Muncie USA built SD70ACe/LCi unit 719 serial 20118693-011 and sister 704 with the first four waggons showing panel repairs and re-lining recently undertaken. 30th July 2017. GeoData.
|
|

060723 7685378 viewsOriginal Hamersley Iron compressor waggon set IC-6 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. Seen here on the causeway just outside 7 Mile. 23rd July 2006.
|
|

241-06378 viewsNelson Point, Goninan GE rebuild C36-7M units 5506 serial 4839-01 / 87-071 and 5510 serial 4839-07 / 87-075 are in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This view from the radiator of 5506 looking at 5510 shows the difference in the Dash 7 radiator on 5506 and the Dash 8 radiator fitted to 5510 following collision repairs. June 2002.
|
|

080116 1374378 viewsChapman Siding, FMG master waggon 2396 tare 22.9 tonnes coupled with Janney Type F Interlock couplers and CSR type bogie. Built by CSR (China Southern) Zhuzhou Rolling Stock Works in China during 2007. 16th January 2008.
|
|

080304 2171378 viewsThomas Yard, down the rail welding end, side view of slave waggon 1241, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

249-28378 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
|
|

267-33378 viewsAt the 39 km, Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 stands with the Sundowner Special alongside the AEI reader at the 39 km detector site on the Newman mainline. This was a special for the 25 years of the Alstom / BHP service agreement. Friday 12th of April 2002.
|
|

040804 155643378 viewsNelson Point, builders plate on Astra Vagoane of Arad in Romania built ore waggon 3307. Shows the date year of 1988 and what looks like a serial number. Three hundred and fifty waggons built during 1988 for Lang Hancock as part of a waggons for iron ore arrangement, only 75 found their way into service with BHP. 4th of August 2004.
|
|

221-27377 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
|
|

225-11377 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, 5669 'Beilun' serial 8412-02 / 95-160 was the final Dash 8 rebuilt for BHP Iron Ore by Goninan as a CM40-8MEFI GE rebuilt from an ALCo, light engine on approach. GeoData.
|
|

226-05377 viewsRedmont, at the 202 km, a loaded Yandi train descends the .76 percent grade with the standard of the time Double Dash 8 combination with 5653 and 5643 leading the charge. GeoData.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
101 |  |
 |
 |
 |
 |
 |
 |
|