Most viewed - Pilbara negative and digital Albums - Iron Ore |
141124 709260 viewsRio Tinto compressor waggon set leader CB 01, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here at 7 Mile, Dampier on 24th November 2014.
|
|
170510 829260 viewsRio Tinto compressor waggon set CB 09, air receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|
170728 0968860 viewsRio Tinto compressor waggon set CB 12, receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|
242-2960 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Mt Goldsworthy to Finucane Island railway. May 2002.
|
|
243-1260 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|
080116 136960 viewsChapman Siding, view from the hand brake end with F type Interlock coupling and hand brake wheel arrangement, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 16th January 2008.
|
|
110620 226160 viewsChapman, a loaded train of Chinese built ore waggons by CSR Zhuzhou Rolling Stock Works loaded with lump ore. 20th June 2011.
|
|
210510 115260 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTS type chute and straddle crane carrying rail waggon RTS 001 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|
226-2159 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track. GeoData.
|
|
226-2659 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|
226-3359 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.
|
|
226-3459 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the vinyl windscreen protectors are fitted to the windscreens, note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.
|
|
226-3559 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the CCTV camera is visible under the radiator wing, this was a trial for single man crewing when operating long end lead, also note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.
|
|
226-3659 viewsShaw siding 219 km, 5654 'Kashima' serial 8412-11 / 93-145 is the trail or slave remote on the mid-train pair of units, note the large flat fuel tank indicating this unit was a Comeng NSW built ALCo before rebuild. GeoData.
|
|
227-2459 views30 km area, second unit on an empty ore train 5651 'Tobata' serial 8412-08 / 93-142 a Goninan CM40-8M GE rebuild. GeoData.
|
|
227-2759 views30 km area, mid-train remote units 5659 and 5641 both Goninan CM40-8M GE rebuilds. GeoData.
|
|
228-3459 viewsYandi Two load-out tunnel, Goninan rebuilt GE CM40-8M model 5649 'Pohang' serial 8412-07/93-140 eases a loading train out of the tunnel at the required 1.2 km/h. 5649 started life back in 1971 as an AE Goodwin built ALCo M636 5473 serial G6047-5. Geodata -22.719050, 119.040566 .
|
|
229-2659 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 with sister unit 5642 drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|
232-2759 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
|
|
233-0359 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
|
|
3610 files on 181 page(s) |
|
|
|
|
|
|
|
|
107 | |
|
|
|
|
|
|
|