Most viewed - Pilbara negative and digital Albums - Iron Ore |

222-33180 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train away from the passing track back onto the mainline following a crew change with second unit 7066.
|
|

224-32180 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|

224-31180 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|

225-22180 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
|
|

225-25180 viewsAt the 24.1 km grade crossing on the BHP Newman line the end of the afternoon Yandi train is seen heading south with last waggon 4305, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. This design was designated HC7081. GeoData.
|
|

227-02180 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.
|
|

227-10180 viewsNelson Point, a view from the rear of A berth at the salt pile and stacker, this was operated by Cargill at the time of the photo. The under harbour tunnel portal is on the right. GeoData.
|
|

227-32180 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
|
|

230-01180 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|

231-32180 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as it runs across the crossing. GeoData.
|
|

231-35180 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

236-02180 viewsNelson Point, Loco Overhaul Shop, BHP Dash 8 class locomotive 5653 'Chiba', a Goninan 1994 rebuild to GE CM40-8M model, serial 8412-10 / 93-144.
|
|

236-10180 viewsNelson Point, Loco Overhaul Shop, BHP AC6000 class locomotive 6072 'Hesta', a General Electric built AC6000 model, serial 51064, seen here in the shed having the windscreen protectors or 'blinkers' fitted.
|
|

040806 091334180 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

040806 092434180 viewsGoldsworthy Junction, weighbridge test waggon 507, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon coupled to 510.
|
|

050410 0545180 viewsNelson Point, tanker filling area, fuel tank waggons 0018 a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 and 0015 a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 and both wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
|
|

050412 0754180 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 517.
|
|

050414 0943180 viewsFlash Butt yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970.
|
|

051001 5643180 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam, through brake pipe is visible over the top of waggon.
|
|

051001 5701180 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #19, 6013, a Scotts of Ipswich Qld built flat waggon from September 1970.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
108 |  |
 |
 |
 |
 |
 |
 |
|