Most viewed - Pilbara negative and digital Albums - Iron Ore |

3079 roster rhs 040627 134646592 viewsNelson Point BHP Billiton SD40 unit 3079 serial 31542 originally Southern Pacific SD40 SP 8461 and still in former owner IC&E blue and yellow has been fitted with some crew amenities like cab air-con, radios and microwave to allow it to operate as a yard pilot, seen here in the yard on the 27th of June 2004.
|
|

150523 8238590 viewsNelson Point Yard, BHP Billiton SD70ACe unit leads a rake towards the dumpers. Lead unit 4327 'Hamersley' is from an order originally being built by Electro-Motive, London Ontario for BNSF, an US class 1 railroad, but BHP secured 10 of them during construction, this unit 4327 serial no. 20066862-056 was destined to be BNSF 9185 before coming to BHP.
|
|

040801 144228589 viewsWalla Siding, Goninan built, Lynx Engineering designed ore waggon 4403 made from 5Cr12Ti stainless steel these waggons are known as Golynx waggons, asset number 203510 with serial 950124-004 and build date 02/2004. 1st August 2004.
|
|

150522 8167588 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 and 5647 serial 8244-12/92-136 were a pair of new Goninan WA CM40-8 model built in 1992 with a Goninan ALCo rebuild 5657 beside them.
|
|

196-01587 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

150522 8184587 viewsWedgefield, Sims Metal yard, no. 2 end of Goninan WA rebuild CM40-8M unit 5638 serial 8281-02/92-127, for full details of these units past lives see here .
|
|

150523 8234587 viewsNelson Point Yard, I Area, waggon scrapping by Sims Metal, a fork lift carries waggon no. 3340, one of 350 waggons built in Romania of which only about 60 made it into service, the rest rusting away in a caged embargo area out on the Broome Road until they were scrapped some years ago. There is a connection with these waggons and Lang Hancock and his former mine McCamey's Monster, now known as Jimblebar. 5665 looks on, its days also numbered.
|
|

150505 7937586 viewsFMG Solomon Line, looking east across earth fill abutment with culverts, sign indicating Babangarra Creek. Geodata: -22.0522533 118.7402133 .
|
|

3090 roster lhs 040912 141400584 viewsNelson Point, BHP Billiton's EMD SD40R unit 3090 serial number 33680 / 7083-10 and was originally Southern Pacific SD40 unit SP8488 built at McCook Illinois in June 1968, rebuilt to SD40R by SP. 12th of September 2004.
|
|

242-08582 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5508 serial 4839-04 / 87-073 about to be trucked to United Goninan Perth for eventual overhaul and repainting into the Pilbara Rail livery and leased to Pilbara Rail re-numbered 5052 as a shunt unit at Dampier. May 2002.
|
|

19794581 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 2 end. Sept 2003.
Jim Bisdee photo.
|
|

041014 122434581 viewsPilbara Railways Historical Society, the Locotrol 'cab' from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Eventually the three locomotives had driving cabs fitted. Donated to the Society around 1998? 14th October 2004.
|
|

218-06580 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
|
|

229-03578 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with 5650 'Yawata' serial 8412-07 / 93-141 leading sister unit 5642, grade crossing is the YT 311.5 km. GeoData.
|
|

150508 8116578 viewsFMG Solomon Line, empty train lead by triple combination of General Electric Dash 9-44CW 004 serial 58181, EMD SD90MAC-H 916 serial 976833-22 and EMD SD70ACe 710 serial 20118693-002 power through the hills around the Bea Bea Creek area. Geodata: -22.0528200 118.7132450 .
|
|

160128 00406578 viewsWedgefield, Sims Metal Yard, rear view of Goninan rebuilt GE model CM40-8M 5641 serial 8281-06, builders no. 92-130 flanked either side by later rebuilds 5660 and 5668. Note the newer rebuilds have marker lights while 41 has none.
|
|

180616 1800r578 viewsEmu Siding, a rare sight in the Pilbara, a Rio Tinto pink iron ore waggon pair to raise awareness for breast cancer. Chinese built Bradken B type waggon pair 20475 control and 25475 slave with a build date of July 2014, still holding colour pretty well in June 2018. GeoData.
|
|

207-16577 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out tunnel as a remote mid-train unit.
|
|

1061 001576 viewsWelshpool, Goninan, Mt Newman Mining's AE Goodwin built ALCo C636 model 5465 serial G6041-1 sits on a road transport float out the front of the workshops, this unit went on to be rebuilt into a GE C36-7M unit 5512. December 1987.
Jim Bisdee photo.
|
|

223-36575 viewsPossum Siding 227 km, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 on a loaded train ex Marandoo holds the mainline awaiting clearance north. 21st October 2000.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
11 |  |
 |
 |
 |
 |
 |
 |
|