Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
150523_8242.jpg
150523 8242686 viewsNelson Point Yard, loaded ore waggon 5073, a Golynx style waggon built by Goninan, serial no. 950126-114 in 2004 with 5Cr12Ti stainless steel which does away with the need to paint the waggon interiors to prevent wear.
219-30.jpg
219-30684 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train along the siding at Goldsworthy to cross a loaded.
150523_8234.jpg
150523 8234683 viewsNelson Point Yard, I Area, waggon scrapping by Sims Metal, a fork lift carries waggon no. 3340, one of 350 waggons built in Romania of which only about 60 made it into service, the rest rusting away in a caged embargo area out on the Broome Road until they were scrapped some years ago. There is a connection with these waggons and Lang Hancock and his former mine McCamey's Monster, now known as Jimblebar. 5665 looks on, its days also numbered.
041014_122434.jpg
041014 122434683 viewsPilbara Railways Historical Society, the Locotrol 'cab' from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Eventually the three locomotives had driving cabs fitted. Donated to the Society around 1998? 14th October 2004.
170915_0712.jpg
170915 0712681 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1006 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
150505_8002.jpg
150505 8002678 viewsFMG Solomon Line, view looking west from the same point as 8001, approach to Bow Siding. Geodata: -22.0256300 118.4896100 .
207-18.jpg
207-18677 viewsBHP General Electric built AC6000 unit 6071 serial 51063 brand new and unnamed on the loaded side of Yandi One load-out loop as a remote mid-train unit, showing roof view and the original style windscreen protectors.
151111_9510.jpg
151111 9510677 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs along on the West Mainline bound for Cape Lambert viewed from Table Hill.
196-01.jpg
196-01676 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
160128_00406.jpg
160128 00406676 viewsWedgefield, Sims Metal Yard, rear view of Goninan rebuilt GE model CM40-8M 5641 serial 8281-06, builders no. 92-130 flanked either side by later rebuilds 5660 and 5668. Note the newer rebuilds have marker lights while 41 has none.
150523_8218.jpg
150523 8218674 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0021, total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
232-26.jpg
232-26674 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggon 2502 is a standard Comeng WA build from the third batch of 180 waggons built in 1970. Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 leads a LocoTrol remote unit built with no cab, a CM40-8ML 5665. 18th of February 1997. GeoData.
040616_162210.jpg
Sundowner EG Budd USA 040616 162210674 viewsNelson Point, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
190911_4757.jpg
190911 4757674 viewsPort Hedland, Broome Rd crossing, BHP's MM 800 track recording vehicle powers south on a recording run, still wearing it's Movember 'mo' as part of a men's health campaign, the MM 800 was built by Mermec in Italy and is a ROGER 800 model, ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
150522_8167.jpg
150522 8167673 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 and 5647 serial 8244-12/92-136 were a pair of new Goninan WA CM40-8 model built in 1992 with a Goninan ALCo rebuild 5657 beside them.
242-22.jpg
242-22673 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Mt Goldsworthy to Finucane Island railway. May 2002.
223-36.jpg
223-36672 viewsPossum Siding 227 km, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 on a loaded train ex Marandoo holds the mainline awaiting clearance north. 21st October 2000.
150505_7963.jpg
150505 7963672 viewsFMG Solomon Line, a pair of General Electric Dash 9-44CW locomotives 005 serial 58182 and 006 serial 58183 struggle upgrade with a loaded train at the 227 km bound for Port Hedland, the bank engines assisting in the rear can just be seen. Geodata: -22.0189283 118.5861050 .
160128_00416.jpg
160128 00416672 viewsView of the cab roof of Goninan rebuild GE model CM40-8M 5654, serial 8412-11, builders no. 93-145, shows tropical roof, marker and head lights, aerials, sand filling hatch covers wipers and strobe light in place of single trumpet horn.
150505_7937.jpg
150505 7937670 viewsFMG Solomon Line, looking east across earth fill abutment with culverts, sign indicating Babangarra Creek. Geodata: -22.0522533 118.7402133 .
6260 files on 313 page(s) 11

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional