Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
150522_8184.jpg
150522 8184537 viewsWedgefield, Sims Metal yard, no. 2 end of Goninan WA rebuild CM40-8M unit 5638 serial 8281-02/92-127, for full details of these units past lives see here .
150523_8231.jpg
150523 8231537 viewsNelson Point Yard, view across BI-LO Crossing, a throw back to days that the supermarket was in fact a BI-LO, well before the current Woolworths, and Action before that. Dash 8 units in the yard, on the 5642 with the Steel Train and 5648 with another on a rake of index waggons. The 2 km post can just be made out at the third light pole from the right.
150523_8238.jpg
150523 8238537 viewsNelson Point Yard, BHP Billiton SD70ACe unit leads a rake towards the dumpers. Lead unit 4327 'Hamersley' is from an order originally being built by Electro-Motive, London Ontario for BNSF, an US class 1 railroad, but BHP secured 10 of them during construction, this unit 4327 serial no. 20066862-056 was destined to be BNSF 9185 before coming to BHP.
1061_001.jpg
1061 001537 viewsWelshpool, Goninan, Mt Newman Mining's AE Goodwin built ALCo C636 model 5465 serial G6041-1 sits on a road transport float out the front of the workshops, this unit went on to be rebuilt into a GE C36-7M unit 5512. December 1987.
Jim Bisdee photo.
196-01.jpg
196-01533 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
150505_7937.jpg
150505 7937533 viewsFMG Solomon Line, looking east across earth fill abutment with culverts, sign indicating Babangarra Creek. Geodata: -22.0522533 118.7402133 .
150523_8200.jpg
150523 8200532 viewsNelson Point Yard, overview of both trains from images 8197 and 8198.
3090_roster_lhs_040912_141400.jpg
3090 roster lhs 040912 141400531 viewsNelson Point, BHP Billiton's EMD SD40R unit 3090 serial number 33680 / 7083-10 and was originally Southern Pacific SD40 unit SP8488 built at McCook Illinois in June 1968, rebuilt to SD40R by SP. 12th of September 2004.
196-05.jpg
196-05529 viewsYandi Two, builders plate for BHP Goninan GE rebuild CM40-8M unit 5658 'Kakogawa' serial 8412-03 / 94-149. Originally AE Goodwin built ALCo M636C unit 5480 serial G6061-1. May 1998.
19794.jpg
19794529 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 2 end. Sept 2003.
Jim Bisdee photo.
180616_1800r.jpg
180616 1800r529 viewsEmu Siding, a rare sight in the Pilbara, a Rio Tinto pink iron ore waggon pair to raise awareness for breast cancer. Chinese built Bradken B type waggon pair 20475 control and 25475 slave with a build date of July 2014, still holding colour pretty well in June 2018. GeoData.
041014_122434.jpg
041014 122434529 viewsPilbara Railways Historical Society, the Locotrol 'cab' from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Eventually the three locomotives had driving cabs fitted. Donated to the Society around 1998? 14th October 2004.
218-06.jpg
218-06528 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
160128_00406.jpg
160128 00406528 viewsWedgefield, Sims Metal Yard, rear view of Goninan rebuilt GE model CM40-8M 5641 serial 8281-06, builders no. 92-130 flanked either side by later rebuilds 5660 and 5668. Note the newer rebuilds have marker lights while 41 has none.
223-04.jpg
223-04527 viewsRosella Siding, old Hamersley Iron machine transporter, prime mover is a KW Dart, possibly a model DE 2551. 21st October 2000.
160128_00404.jpg
160128 00404527 viewsWedgefield, Sims Metal Yard, front view of Goninan rebuilt GE model CM40-8M 5660 serial 8412-05, builders no. 94-151.
160128_00408.jpg
160128 00408527 viewsWedgefield, Sims Metal Yard, front view of Goninan rebuilt GE model CM40-8M 5655 serial 8412-12, builders no. 93-146 flanked on the left by older sister unit 5642 and on the right by sister 5653. Note these two newer rebuilds have marker lights while 42 has none but has a snow plough on the no. 2 end.
1050_001.jpg
1050 001527 viewsWelshpool, Goninan Open Day 27th August, 1988. Brand new GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 is only in the early stages of construction for Mt Newman Mining.
Jim Bisdee photo.
190911_4757.jpg
190911 4757527 viewsPort Hedland, Broome Rd crossing, BHP's MM 800 track recording vehicle powers south on a recording run, still wearing it's Movember 'mo' as part of a men's health campaign, the MM 800 was built by Mermec in Italy and is a ROGER 800 model, ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
150505_7963.jpg
150505 7963525 viewsFMG Solomon Line, a pair of General Electric Dash 9-44CW locomotives 005 serial 58182 and 006 serial 58183 struggle upgrade with a loaded train at the 227 km bound for Port Hedland, the bank engines assisting in the rear can just be seen. Geodata: -22.0189283 118.5861050 .
6096 files on 305 page(s) 11

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional