Most viewed - Pilbara negative and digital Albums - Iron Ore |
180616 1791228 viewsAt the 81 km, loaded Bradken China built B series 'master' waggon 20238 with 'slave' waggon 25238, build date April 2013, leading and setup as an instrumented ore waggon, the solar panels are for charging the instrument batteries.
|
|
1051 001228 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079 out the front of the workshop on display.
Jim Bisdee photo.
|
|
196-07227 viewsYandi Two, BHP Iron Ore 5630 'Zeus' serial 5831-09 / 88-079 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
|
|
219-05227 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7090 serial 47769 and 7089 idle away waiting their next loaded train to push out.
|
|
16948227 viewsBassendean, the rear of Goninan's workshops, Mt Newman Mining's AE Goodwin built ALCo M636 unit 5480 serial G6061-1 being prepped for rebuilding into 5658. October 1993.
Jim Bisdee photo.
|
|
180616 1826227 viewsEmu Siding, Bradken NSW built S series ore waggon pair 1830 'master' and 6840 'slave' with HI ownership marks setup as an instrumented ore waggon pair, seen here in an empty train. 16th June 2018.
|
|
207-14225 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit, view of the left hand side cab and steerable bogie.
|
|
207-25225 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, with 'Kalgan' nameboards removed for fitting to AC6000 class 6074, holds the main with a loaded Yarrie train awaiting a cross.
|
|
219-09225 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7089 serial 47768 idles away waiting the next loaded train to push out.
|
|
219-30225 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train along the siding at Goldsworthy to cross a loaded.
|
|
223-10224 viewsPossum Siding, Hamersley Iron rail grinder, Speno built RR 48 M-1 model sits in the back track siding. 21st October 2000.
|
|
150522 8165224 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 and 5647 serial 8244-12/92-136 were a pair of new Goninan WA CM40-8 model built in 1992.
|
|
218-01223 viewsYandi, river access road that runs between Roy Hill Rd and Yandi Junction, sort of following the train line, Toyota Land Cruiser Toy Titan, 1994 HJ75 series tray back.
|
|
150505 7944223 viewsFMG Solomon Line, looking west, earth fill abutment embankment for rail line, Jingarri Creek, view from the western side, expanded view from 7942, access road visible at left. Geodata: -22.0525633 118.7199633 .
|
|
180616 1810223 viewsEmu Siding, an empty train from Cape Lambert powers upgrade away from Emu Siding up the 1.6 percent grade behind Rio Tinto loco 8149 with serial 58730 a GE Erie built GE model ES44DCi from the 3rd order in Rio Tinto Stripes livery and 8193 with Dash 9-44CW unit 7089 with a consist of S and C type waggons. 16th June 2018. GeoData.
|
|
196-02221 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|
150505 7940221 viewsFMG Solomon Line, looking east, earth fill abutment embankment for rail line, Jingarri Creek. Geodata: -22.0545750 118.7278517 .
|
|
040407 080337221 viewsToy Titan on the lean when the LHS rear wheel parted company and went bush. 23 km Newman mainline. Wednesday 7th April 2004.
|
|
207-08220 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
|
|
041225 065025219 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 handbrake detail. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
|
|
3627 files on 182 page(s) |
|
|
|
|
|
|
|
|
11 | |
|
|
|
|
|
|
|