Most viewed - Pilbara negative and digital Albums - Iron Ore |

2703 Mt Newman Mining Workshops 040806 102536409 viewsFlash Butt yard, view of the end of test waggon 2703 showing the collection of cables and the Do Not Uncouple sign.
|
|

0534 Magor USA 051001 5652409 viewsFlash Butt yard, rear of rake of Magor USA built ballast waggons, 534 is closest to camera.
|
|

050421 1625409 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the front unit was later stickered as RG 2, the rear unit was stickered as RG 1 and is serial M20. 21st April 2005.
|
|

060326 3208409 viewsBing Siding, south arrival BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480 takes the mainline with the new western mainline in the foreground. 26th March 2006.
|
|

0035 CNR - QRRS China 150523 8205409 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0035, one of a second batch delivered in 2015 with safety slogan 'Take time to work safely' coupled to Comeng WA built tank waggon 0013 from 1974-75.
|
|

0034 CNR - QRRS China 160128 00336409 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0034, one of a second batch delivered in 2015 with safety slogan 'Think Safe + Work Safe = Go Home Safe'.
|
|

241-37409 viewsNelson Point, Car Dumper 2 holding roads, two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.
|
|

249-27409 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo. Approximate location. 18th December 1999.
|
|

251-05409 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5513 awaits its fate. Rebuilt in 1988 at Goninan's Welshpool factory from 1970 AE Goodwin built ALCo C636 with serial number G6012-2 and road number 5453 and assigned new serial number 4839-02 / 88-078. It was delivered in Mt Newman Mining orange and was named Kalgan. 22nd April 2000.
|
|

252-12409 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 01 is behind the locomotive. Location is roughly here. 24th November 2001.
|
|

255-07409 viewsSiding Three looking south along the Cape Lambert to Deepdale mainline at the south end signal for the mainline, passing track is on the right with points in the distance. May 2002.
|
|

269-25409 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

218-26408 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7090 serial 47769 and 7089 idle away waiting their next loaded train to push out.
|
|

221-28408 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
|
|

234-14408 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of right hand side engine hood and fuel tank. Circa 1998.
|
|

234-17408 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 builders plate. Circa 1998.
|
|

235-14408 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 passes out the other side of the loadout tunnel as loading has commenced, the dust extraction equipment and retaining wall culvert frame the loco.
|
|

238-20408 viewsNelson Point loco overhaul shop sees former Southern Pacific loco 3079 EMD model SD40, serial number 7861-52 with the long hood removed due to the 645 prime mover failing not long after arrival in Australia. 27th January 2004. Geodata .
|
|

239-22408 viewsOverview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the screen house, radial stacker on the stockpile, power station, new and old side tertiary crushing structures, sub-station 4, the control room and on the extreme right the secondary crusher structure. GeoData.
|
|

0510 Mt Newman Mining Workshops 040806 092738408 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a weighbridge test waggon. The others in the fleet are 40, 60 and 100 tons.
|
|
| 6217 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
111 |  |
 |
 |
 |
 |
 |
 |
|