224-30370 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|

228-13370 viewsYandi Two mobile machine fuel point. A Caterpillar 16G road motor grader is receiving attention.
|
|

231-28370 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h, note the missing logo from the hood and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
|
|

232-04370 viewsYandi Two, view west from near the 311.6 km grade crossing, train can be seen loading on the right. February 1997. GeoData.
|
|

233-29370 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

239-13370 viewsOverview of the Yandi One sizing plant looking north from above the middling crushers along CV4 (middle belt) to the screen house which houses six Jaques 'banana screens'. The feed bin and associated feed conveyors, travelling left and right can be clearly seen. The 'new side' is on the left and the 'old side' on the right. The feed along CV10 to the stockpile is obscured by the 'old side' structure and Sub-Station 3 can just be made out. GeoData.
|
|

050412 0735370 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive on the point of an empty ballast waggon rake awaiting loading, waggons are modified Magor USA built ore waggons from the Oroville Dam construction.
|
|

050412 0772370 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 502.
|
|

050518 2106370 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 752.
|
|

050518 2196370 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 527, originally in ore service before conversion to a ballast waggon.
|
|

050801 4766370 viewsFlash Butt yard, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich Qld on 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

060429 3738370 viewsFlash Butt yard, Pony re-laying waggon, #1, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
|
|

050625 3811370 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
|
|

060429 3767370 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc with a Barclay Mowlem id number BM57. 29th April 2006.
|
|

081217 0457370 viewsWoodstock Siding, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977 under order number 07-M-282 RY. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
|
|

100717 0665370 viewsFlash Butt yard, new rail stock carrier waggon 6023, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

110619 1881370 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #11, 6210, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

150314 7743370 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
|
|

150729 9455370 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
|
|

243-04370 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
|
|