Most viewed - Pilbara negative and digital Albums - Iron Ore |

051001 5739367 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
|
|

050522 2731367 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #21, 6007 with registered number G506007, built by Scotts of Ipswich Qld in 1970.
|
|

050724 4310367 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
|
|

060501 3899367 viewsTabba Siding, built by Difco USA in 1971 for Mt Newman Mining in a group of four, 701 was the class leader of the long side dump waggons.
|
|

050801 4728367 viewsFlash Butt yard, Barclay Mowlem tamping machine TM 8644 a Tamper HSTR 130 model serial 3581011. 1st August 2005.
|
|

100717 0669367 viewsFlash Butt yard, new rail stock carrier waggon 6021, built by Gemco Rail in 2010 riding on Barber bogies.
|
|

100717 0671367 viewsFlash Butt yard, new rail stock carrier waggon 6025, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

110208 9434367 viewsFlash Butt yard, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the height adjustable lead roller guide is upright, squeeze rollers behind the mesh.
|
|

130720 1562367 viewsFlash Butt yard, CFCLA ballast waggon CHQY class CHQY 732, former US-Canadian CRDX class.
|
|

080304 2174367 viewsThomas Yard, down the rail welding end, side view of control waggon 2354, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

247-30367 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8. Location is here.22nd May 2002.
|
|

267-02367 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with mid-train units CM40-8M units 5651 and 5645 104 waggons back with 104 waggons trailing. 1247 hrs 12th of April 2002.
|
|

110620 2392r367 viewsWalla, comparison between loaded BHP ore waggons from Comeng WA in 2925 and from Astra Vagoane, Arad Romania in 3312. 2925 is from a batch of four hundred built in 1971 by Comeng WA, while 3312 is from a batch of three hundred and fifty built in 1988 by Astra Vagoane, of which only two hundred and eighty-four didn't enter service. The Comeng build features square side and floor joins, while the Astra Vagoane build is all rounded. 20th of June 2011.
|
|

220-26366 viewsGoldsworthy Junction, an empty train on the Newman line approaches having departed Nelson Point. The line merging in from the right is the Goldsworthy line to Yarrie and Nimingarra, which can then be made out diverging to the left just after the interlocking room in front of the train.
|
|

221-33366 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.
|
|

226-09366 viewsRedmont, at the 202 km the mid-train remotes Goninan rebuild CM40-8M GE unit 5644 'Kangan' serial 8281-09/92-133 leads sister unit 5639. GeoData.
|
|

232-19366 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls. February 1997. GeoData.
|
|

235-12366 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 passes out the other side of the loadout tunnel as loading has commenced, the dust extraction equipment and retaining wall culvert frame the loco.
|
|

236-29366 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
|
|

238-15366 viewsNelson Point, ex Southern Pacific tunnel motor locomotive 8335 an EMD SD40T-2 unit, serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, purchased as a spare parts source for the other SD40 style units BHP Billiton purchased in 2003/04. 19th November 2003. Geodata .
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
120 |  |
 |
 |
 |
 |
 |
 |
|